Similar Projects
1200 South; 1200 E to 3600 E Small Urban
Bidding
$500,000 to $1,500,000 est. value
UT

Asphalt Maintenance
Post-Bid
Heber City, UT 84032

2020 Midway Trails Homestead Drive and River Road
Post-Bid
Midway, UT 84049

DFCM Construction-Pre Qualification for General/Mechanical/Electrical/Roofing/Paving Contractors
Results
$3,500,000 est. value

SR-32; Jct. US-40 to Region 2 Boundary
Results
$500,000 to $1,500,000 est. value
UT

SR-113; Shoulder Widening Charleston to Midway Choke Point
Post-Bid
$3,000,000 to $4,000,000 est. value
UT

US-40; Strawberry Valley Passing Lane and Pvmt Rehab
Results
$20,000,000 to $30,000,000 est. value
UT

SR-113 and Michie Lane Intersection Other-Roadway Project
Results
Less than $500,000 est. value
UT

Services for Asphalt/Slurry/Crack Sealant
Results

2019 650 South, South Field Road, 100 East/ 200 North Improvements
Results
Less than $625,019 est. value
Heber, UT

2019 Cemetery Road and Tate Lane Water Line
Results
Midway, UT

2019 Crack Seal Project
Results
Heber, UT

2019 600 South 300 West to Main Street and 100 West Improvements
Results
Heber City, UT

Main Street Reconstruction Project
Results
Less than $800,000 est. value
Wallsburg, UT

UT FLAP 70131(1), Strawberry Sheep Creek
Results
$15,000,000 to $20,000,000 est. value
Charleston, UT 84032

Last Updated 01/23/2019 02:11 PM
Project Title

UT Flap 3108(1), Cascade Springs Road

Physical Address View project details and contacts
City, State (County) UT   (Wasatch County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,000,000 to $15,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Full and open competition: The proposed project consists of the rehabilitation and paving of the existing Cascade Springs Road and of Cascade Scenic Drive (FR114) route, beginning at the junction of SR-92 and continuing easterly approximately 12 miles towards Heber City, Utah. The road will require shoulder and surface work at various locations. Improvements include minor widening and realignment; stabilization of shoulders and reinforced soil slopes; clearing roadside vegetation; grading; replacing undersized cross drainage structures; asphalt surfacing; and updating signing and pavement markings. No horizontal or vertical alignment changes are proposed. This estimate assumes pulverizing the existing asphalt to a 6" depth and 3" of asphalt overlay.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents