Similar Projects
Insulation Installation and Repair
Term Contract
Bidding
Raleigh, NC 27610

General Construction (FAL)
Term Contract
Bidding
Raleigh, NC 27610

Piedmont Triad Airport Residential Sound Insulation, Phase 7
Post-Bid
Greensboro, NC 27400

Cordelia Camp Backfill - Admissions to HFR 1st Floor Upfit - Paneling and Ceilings
Post-Bid
Cullowhee, NC 28723

Office Partition Installation
Results
Sneads Ferry, NC 28460

Window and Wall Repairs
Results
Less than $287,000 est. value
Elizabeth City, NC

6924565 Repair Shower Pans, Ceiling, & Wall Leaks in Various Bldgs
Bidding
$250,000 to $500,000 est. value
Cherry Point, NC

North Carolina State Capitol Building Improvements
Post-Bid
Raleigh, NC

Courthouse Sheetrock Replacement and Repairs
Results
Beaufort, NC

1108 & S90 Interior Repairs
Bidding
$100,000 to $250,000 est. value
Camp Lejeune, NC 28547

City Hall Garage Ceiling
Post-Bid
Asheville, NC

Weaver Court 5 Dwelling Unit Cleanup
Results
Lumberton, NC

Paint Flooring Various Bldgs Rr2, As502, Tc701, Rr280, G640 And Rr6 Window, Gypsum, Duct Repair
Bidding
Camp Lejeune, NC 28547

Cafeteria Dining Room Design/Decor
Post-Bid
Lexington, NC

Superior 1 Sheetrock Repair and Paint
Results
Beaufort, NC 28516

Last Updated 05/09/2019 11:51 AM
Project Title

Samarcand Training Academy - Phase 2 - Tufts Building

Physical Address View project details and contacts
City, State (County) Eagle Springs, NC 27242   (Moore County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method
Project Status Construction Commenced November 2018
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description This contract package is for the Cabinets, Countertops and Window Sills for the Tufts Building located at the Samarcand Training Academy. This package will be responsible to furnish, fabricate and install all Cabinets, Countertops and window sills.
Details
Division 08 - Openings, Windows.
Division 09 - Finishes.
Division 12 - Furnishings, Countertops, Office Furniture, Filing Cabinets.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents