Similar Projects
Flood Control Inlet Concrete Repair, Littleville Lake, Huntington, Ma
Design
Huntington, MA 01050

Coates Road Over Glen Brook Culvert Replacement with Bridge
Renovation, Infrastructure
Bidding
$482,895 est. value
Leyden, MA 01301

Gate 40 Culvert Upgrade
Infrastructure
Bidding
$450,000 est. value
Petersham, MA 01366

Corrugated Polyethylene Pipe
Post-Bid
Leicester, MA

Maintenance of Existing Drainage Outfall
Post-Bid
Less than $15,000 est. value
Dedham, MA 02026

Replacement of Culvert No S-30-022 (Precast Concrete) and Related Work on A Section of Main Street (Route 20) Over Cedar Meadow Brook
Results
Less than $3,399,266 est. value
Sturbridge, MA 01566

Replacement of South Street Culvert
Results
Stoughton, MA

Main Street/122A Drainage Improvements Project
Infrastructure
Bidding
Less than $900,000 est. value
Holden, MA

Shot Crete Services for Seawall Projects
Post-Bid
Cohasset, MA 02025

Drilling IDIQ in Massachusetts and Rhode Island
Results

Whitney Street Culvert Rehabilitaiton
Infrastructure
Bidding
$75,000 est. value
Westminster, MA 01473

B19 Drainage Improvements
Post-Bid
Less than $35,000 est. value
Springfield, MA

104 and 108 Forest Street Drainage Project
Results
Less than $100,000 est. value
Wellesley, MA 02481

Sanderson Street Improvements - Phases 1 and 2
Infrastructure
Bidding
$1,650,000 est. value
Greenfield, MA 01301

Round Pond Retaining Wall Reconstruction
Post-Bid
Less than $550,000 est. value
Millbury, MA

Last Updated 01/05/2022 09:44 AM
Project Title

Scheduled And Emergency Drainage Repairs And Improvements At Various Locations

Physical Address View project details and contacts
City, State (County) (Franklin, Hampden, Hampshire, Norfolk, Worcester Counties)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

"0.100","a","Clearing","101.1" "15.000","Ea","Tree Removed - Diameter Under 24 Inches","103." "2.000","Ea","Stump Removed","105." "2000.000","Cy","Unclassified Excavation","120.1" "10.000","Cy","Reinforced Concrete Excavation","127.1" "30.000","Cy","Class a Trench Excavation","141." "700.000","Cy","Test Pit for Exploration","141.1" "10.000","Cy","Class B Rock Excavation","144." "10.000","Ea","Drainage Structure Removed","146." "2000.000","Cy","Gravel Borrow","151." "6.000","Cy","Controlled Density Fill - Excavatable","153." "2500.000","Sy","Regrading Topsoil","172.1" "10.000","Ea","Catch Basin","201." "1.000","Ea","Manhole","202." "10.000","Ea","Drop Inlet, Type Bf","207.1" "10.000","Ea","Drop Inlet Change in Type","209.3" "50.000","Ea","Drainage Structure Adjusted","220." "500.000","Ft","Drainage Structure Rebuilt","220.2" "20.000","Ea","Frame and Cover","221." "20.000","Ea","Frame and Cover - Secured","221.1" "20.000","Ea","Frame and Grate - Massdot Bar Type","222." "35.000","Ea","Frame and Grate - Massdot Cascade Type","222.1" "40.000","Ea","Frame and Grate - Massdot Drop Inlet","222.2" "8.000","Hr","Internall Pipe Inspection by Video Camera","226.9" "40.000","Cy","Removal of Drainage Structure Sediment","227.3" "6000.000","Ft","Removal of Drainage Pipe Sediment","227.31" "1000.000","Ft","12 Inch Drainage Pipe - Option","234.12" "100.000","Ft","18 Inch Drainage Pipe - Option","234.18" "10.000","Ft","24 Inch Drainage Pipe - Option","234.24" "20.000","Ea","12 Inch Drainage Pipe Flared End - Option","235.12" "2.000","Ea","18 Inch Drainage Pipe Flared End - Option","235.18" "1.000","Ea","24 Inch Drainage Pipe Flared End - Option","235.24" "20.000","Sy","Stone for Pipe Ends","258." "100.000","Ft","6 Inch Pipe Subdrain - Option","265.06" "100.000","Ton","Hot Mix Asphalt Waterway","280.1" "120.000","Ton","Dense Graded Crushed Stone for Shoulders","402.11" "600.000","Ton","Hma for Patching","451." "400.000","Ft","Curb Removed and Reset","580." "5.000","Ea","Curb Inlet Removed and Reset","581." "350.000","Ft","Highway Guard Removed and Reset","630." "60.000","Ft","Chain Link Fence Removed and Reset","666." "100.000","Ft","Sedimentation Fence","697." "2200.000","Sy","Geotextile Fabric for Subsurface Drainage","698.2" "10.000","Ea","Emergency Response","748.1" "300.000","Cy","Loam Borrow","751." "100.000","Ft","Sediment Control Barrier","767.121" "600.000","Sy","Jute Mesh","767.9" "4.000","Hr","Roadway Flagger","850.41" "50.000","Day","Traffic Cones for Traffic Management","851.1" "196.000","Sf","Safety Signing for Traffic Management","852." "80.000","Day","Truck Mounted Attenuator","853.403" "5.000","Day","Temporary Illumination for Work Zone","853.8" "100.000","Day","Arrow Board","856." "5.000","Day","Portable Changeable Message Sign","856.12" "5.000","Day","Reflectorized Drums With Sequential Flashing Warning Lights","859.1" "5.000","Ea","Traffic Sign Removed and Reset","874.2" "12.000","Cy","4000 Psi, 3/4 Inch, 610 Cement Concrete","904." "500.000","Lb","Steel Reinforcement for Structures - Epoxy Coated","910.1" "500.000","Ton","Modified Riprap","983.11"

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents