Similar Projects
Beckham's Miami Freedom Park - United Major League Soccer Stadium
New Construction - 1,000,000 SF
Conception
$1,000,000,000 est. value
Miami, FL

Olympus Master Plan
New Construction - 861,283 SF
Conception
$10,000,000 CJ est. value
Clermont, FL 34711

Former Flea World Redevelopment
New Construction - 2,400,000 SF
Design
Sanford, FL 32773

Pearl Eagles Boutique Hotel - Phase 2
New Construction - 67,402 SF
Design
Orlando, FL 32821

Tru by Hilton
New Construction - 46,634 SF
Sub-Bidding
$25,000,000 est. value
Miramar, FL 33027

Homewood Suites by Hilton
New Construction, Build-Out - 103,709 SF
Post-Bid
$7,000,000 est. value
Fort Lauderdale, FL 33308

StayAPT
New Construction - 45,020 SF
Post-Bid
$6,500,000 est. value
Tallahassee, FL

Rome Yard Mixed Use Development
Results
Tampa, FL 33602

Depot District Train Station Restaurant, Sundry Store and/or Entertainment
Renovation, Alteration
Results
Inverness, FL 34450

The Plaza Coral Gables
New Construction - 2,120,000 SF
Construction
$100,000,000 est. value
Coral Gables, FL 33134

Miami River
New Construction - 3,678,706 SF
Construction
Less than $310,000,000 est. value
Miami, FL

Thompson Hotel - Hyatt
New Construction - 111,000 SF
Pending Verification
Tampa, FL 33602

Siesta Key Boutique Hotel
New Construction - 235,559 SF
Pending Verification
Siesta Key, FL 34242

Parrish Farms - Master Plan
New Construction - 4,000,000 SF
Conception
$10,000,000 CJ est. value
FL

Dunes Hotel
New Construction - 118,544 SF
Design
$9,000,000 est. value
Fort Lauderdale, FL 33316

Reported 07/01/2022 12:00 AM
Project Title

Home2 Suites by Hilton

Physical Address View project details and contacts
City, State (County) Fort Pierce, FL 34945   (Saint Lucie County)
Category(s) Commercial
Sub-Category(s) Hotel/Motel
Contracting Method Competitive Bids.
Project Status Sub-Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Hotel/Motel, 4 Stories Above Grade, 58,563 SF New Construction 95 Unit(s), 1.99 Acres.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 13 - Special Construction, Swimming Pools.
Division 14 - Conveying Equipment, Elevators.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents