Similar Projects
17 South 2nd Street
Renovation
Conception
Harrisburg, PA 17104

21 South 2nd Street
New Construction
Conception
Harrisburg, PA 17104

AutoZone #3794
New Construction - 6,816 SF
Design
$500,000 to $1,000,000 est. value
Elizabethtown, PA 17022

Steel Town Mixed Use Development
New Construction - 125,000 SF
Design
$12,000,000 est. value
Steelton, PA 17113

Franklin County Regional Airport Construct Snow Removal Equipment Storage Building-Phase II
New Construction - 2,117 SF
Bidding
$500,000 to $1,000,000 CJ est. value
Chambersburg, Middletown, PA 17201

Walmart 0-1--TENANTBID--2021 - Bundle#1
Renovation
Bidding by Invitation

Temporary Office Trailer
New Construction - 2,300 SF
Post-Bid
Harrisburg, PA 17110

Sump Upgrade For Three Sites in NJ & PA
Renovation
Post-Bid

35 DEP 14X40 Shed Structure
Results
Harrisburg, PA

Construction of Salt Shed
Results
Hummelstown, PA 17036

Walmart Supercenter #1591-227 - RM-1
Renovation - 204,108 SF
Construction
$2,223,982 est. value
Harrisburg, PA 17111

Walmart Supercenter #3412-237 - OGP
Renovation - 850 SF
Construction
$176,780 est. value
Elizabethville, PA 17023

Enders Land Development
New Construction - 6,500 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Harrisburg, PA

Hudson Office Building
New Construction, Demolition - 129,120 SF
Pending Verification
$10,000,000 CJ est. value
Harrisburg, PA 17110

Linglestown Road Office Building
New Construction - 3,000 SF
Conception
Harrisburg, PA 17110

Last Updated 01/23/2020 01:45 PM
Project Title

UPS Northeast Regional Hub

Physical Address View project details and contacts
City, State (County) Middletown, PA 17057   (Dauphin County)
Category(s) Commercial
Sub-Category(s) Car Wash, Office, Retail, Warehouse/Storage
Contracting Method Owner to Subcontract by Invitation Only.
Project Status Construction Commenced November 2019
Bids Due View project details and contacts
Estimated Value Greater than $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Car Wash, Retail, Office, 1, 775,000 SF New Construction, 192 Acres, Warehouse/Storage.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving, Flagpoles.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment, Parking Control Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents