Similar Projects
Rehabilitation of Screened Final Effluent (SFE) Pump Station - 216008 - The Great Lakes Water Authority
Infrastructure, Alteration
Conception
Less than $35,607,000 est. value
Detroit, MI 48209

Dearborn Public Schools Capital Improvements ? Howe Elementary School Water Service Replacement
Infrastructure
Bidding
$300,000 est. value
Dearborn Heights, MI 48127

Water Meter Installation
Term Contract
Post-Bid
Detroit, MI

Water Meter Replacement Program
Infrastructure
Post-Bid
Ecorse, MI

2020 Tap and water Repair Contract
Results
Ecorse, MI 48229

Garland, Hurlbut, Bewick Water Transmission System Rehabilitation (NE Transmission Phase 3)
Results
Detroit, MI

Cold Water Single Register Mech Type 2 Inch Meters
Infrastructure
Post-Bid
Detroit, MI

2021 Water Main and Sewer Repair Contract
Results
Ecorse, MI

2022 Water Main And Sewer Repairs
Alteration
Post-Bid
Ecorse, MI

2020 Water Main Replacement Multiple Locations
Results
Grosse Ile, MI 48138

2022-2024 Lead Water Service Line Replacement
Term Contract
Post-Bid
River Rouge, MI

Replacement of Pavement and Water Mains
Results
$2,250,000 est. value
Allen Park, MI 48101

Water Systems Improvements - Evergreen, Grand River, Warrendale and Franklin Park
Alteration
Post-Bid
Dearborn Heights, Detroit, MI 48219

Northville Road PRV Replacement Project
Results
Plymouth, MI

2022 Local Streets and Utilities Replacement
Infrastructure
Post-Bid
Northville, MI

Reported 06/23/2022 12:00 AM
Project Title

Avondale Road Reconstruction Phase 2 - Water Main Improvements

Physical Address View project details and contacts
City, State (County) Inkster, MI 48141   (Wayne County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Inkster has allocated funds for the reconstruction of Avondale Road from just east of Eastern Avenue to the just east of Inkster Road, for an approximate length of 4,500 feet. These funds shall be used for the construction of water main, lead service replacement, and concrete street reconstruction.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents