Similar Projects
Canyon Road Sidewalk - 4380 North To Foothill Drive - City Of Provo
Infrastructure
Conception
$250,000 est. value
Provo, UT

5600 North / University Avenue Traffic Light - City of Provo
Infrastructure
Conception
$2,400,000 est. value
Provo, UT 84604

1300 West Street Realingment Project
Infrastructure
Bidding
$400,000 est. value
Pleasant Grove, UT 84062

1300 West Street Realingment Project
Infrastructure
Bidding
$400,000 est. value
Pleasant Grove, UT 84062

2021 Roads Project
Post-Bid
Lehi, UT

Airport Road Traffic Signal - New Roadway and Intersection
Post-Bid
Eagle Mountain, UT

2019 Overlay Project
Results
Less than $294,507 est. value
Alpine, UT 84004

US-89; Fairview to County Line
Results
$4,000,000 to $6,000,000 est. value

Spanish Fork 3 Parking Lot Expansion
Alteration
Construction
Spanish Fork, UT 84660

Low Book Sales Dealership Expansion
New Construction, Alteration
Pending Verification
Lindon, UT 84042

Otteson Subdivision Street Improvements
Alteration
Pending Verification
Salem, UT 84653

700 East - 900 North to 800 North (20 in. 700 feet) - City of Provo
Infrastructure
Conception
$300,000 est. value
Provo, UT 84603

Udot AVL (Approved Vendor List)- Hot Mix Asphalt
Term Contract
Post-Bid

2021 Full Mill and Edge Mill Overlay Project
Results
Cedar Hills, UT

Red Bridge - Pid Super Pad
Alteration
Pending Verification
Orem, UT

Reported 06/21/2022 12:37 PM
Project Title

600 South Sidewalk - 1100 West To 1600 West - City Of Provo

Physical Address View project details and contacts
City, State (County) Provo, UT   (Utah County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2025
Bids Due View project details and contacts
Estimated Value $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a mixed-use development in Provo, Utah. Conceptual plans call for paving for a road / highway; and sidewalk / parking lot. This project is to install curb, gutter, sidewalk, and pavement on south side of 600 S from 1100 W to 1600 W. The project would benefit a safe route for school children at Sunset View ES in two ways: (1) it provides a sidewalk to the school crossing for those living in the new Kelshaw development, and (2) it would allow the existing crossing of 600 S at 1100 W- which in not stop controlled - to be switch to crossing 1100 W - which is stop controlled. Engineering has secured a $200,000 UDOT Safe Routes grant for FY 2025, which would reimburse sidewalk costs. As of June 17, 2022, this project is currently in the FY 2023-2027 CIP. Funding for this project is allotted in the city's capital improvement plan for construction FY 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents