Similar Projects
Chart Industries - Theodore
New Construction, Renovation
Conception
$2,500,000 est. value
Theodore, AL 36582

NASCAR Speedway Commerce Center Business Park/Lincoln
New Construction - 3,000,000 SF
Conception
$640,000,000 est. value
Lincoln, AL 35096

Homtex
Renovation
Design
Selma, AL 36701

Wellborn Cabinet
New Construction
Design
Ashland, AL

Y--HIF Construction
New Construction
Results
$30,000,000 to $40,000,000 est. value
Tuscaloosa, AL

Mercedes Battery Facility
New Construction - 1,000,000 SF
Construction
$1,000,000,000 est. value
Woodstock, AL

Warrior Met Coal - Expansion of Mine No. 4
New Construction
Construction
$578,000,000 est. value
Brookwood, AL 35444

AM/NS Calvert Steel Mill
Addition
Pending Verification
$775,000,000 est. value
Calvert, Mobile, AL 36513

Polyplex Manufacturing
New Construction - 70,000 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Decatur, AL 35601

Gregory Industries
New Construction - 350,000 SF
Conception
Athens, AL 35614

Frios Gourmet Pops Moves On 20 Million Dollar Expansion
Renovation - 130,000 SF
Design
Mobile, AL 36606

Southern Visions
New Construction - 125,000 SF
Construction
$24,000,000 est. value
Bay Minette, AL

SMP - Automotive
Renovation
Pending Verification
$4,195,000 est. value
Cottondale, AL

Toyota Expansion
Addition - 114,000 SF
Design
$52,000,000 est. value
Huntsville, AL 35810

Wood Pellet Plant
New Construction
Construction
$100,000,000 est. value
Demopolis, AL 36732

Last Updated 07/12/2022 01:26 PM
Project Title

Fedex Ground

Physical Address View project details and contacts
City, State (County) Hope Hull, AL 36043   (Montgomery County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant
Contracting Method
Project Status Construction Commenced June 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and new construction of an industrial development in Montgomery, Alabama. Completed plans call for the construction of a industrial development. As of July 11, 2022, construction has begun. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

1 Manufacturing/Processing Plant, 1 Story Above Grade, 141,002 SF New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents