Similar Projects
Last Updated | 06/08/2021 11:12 AM |
Project Title | Furnish County Highway 8 Bridge Floor System Replacement Project |
Physical Address | View project details and contacts |
City, State (County) | Gilbertsville, NY (Otsego County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The County is proposing to replace all of the existing Core-Ten steel components except the pony trusses (floor beams, stringers, connection angles, etc.), as well as the actual bridge deck, which will consist solely of lightweight concrete, and not receive asphalt surface treatment. The County will close the road during the course of construction operations, via an off-site detour. The contracted portion of the project shall include, but not necessarily be limited to: demolition, removal, and disposal of the existing asphalt concrete deck & steel pan, all of the existing Core-Ten steel components (floor beams, stringers, connection angles, etc.); and furnish and install new galvanized steel superstructure components (floor beams, stringers, connection angles, etc.), elastomeric bearings, and placement of SIP forms and lightweight concrete deck. |
||||||||||||||||||||
Details | Bridge, Renovation.
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |