Similar Projects
Port Allen Phase III Bulk Scale and Annex
Infrastructure
Post-Bid
$5,500,000 to $7,500,000 est. value
Port Allen, LA

Roadway Improvements
Infrastructure
Post-Bid
Jena, LA

Emergency Contingency Safety and Traffic
Infrastructure
Results
Baton Rouge, LA

La 13 - 2.7 Mi N La 14 - 0.2 Mi N Acadia P/L
Infrastructure
Results
$2,500,000 to $5,000,000 est. value
Crowley, LA 70527

Winfield Road Improvements
Infrastructure
Post-Bid
Bossier City, LA

I-10 Atch Basin BR W Baton Rouge P/L
Infrastructure
Results
Lafayette, LA

Downtown Loop Pavement Replacement Phase 2
Infrastructure
Post-Bid
New Orleans, LA

Lafourche - Terrebonne Scenic Overlook
Infrastructure
Results
$100,000 to $250,000 est. value
LA

Ac-10 Asphalt, Mc-30 Prime, Asphalt Emulsion Prime
Infrastructure
Post-Bid
Farmerville, LA

LA 465: LA 8 - LA 28
Infrastructure
Results
$2,500,000 to $5,000,000 est. value
LA

Cold Mix (Colay) and Hot Mix
Infrastructure
Post-Bid
Farmerville, LA

LA 128: LA 573 - US 65
Infrastructure
Results
$1,000,000 to $2,500,000 est. value
LA

Cold Mix
Infrastructure
Post-Bid
Saint Martinville, LA

US 90: Cameron St. Overlay
Infrastructure
Results
$2,500,000 to $5,000,000 est. value
LA

2021 Street Improvements
Infrastructure
Post-Bid
Winnsboro, LA

Reported 06/27/2022 04:01 PM
Project Title

Up Several RR Xings (Olla)

Physical Address View project details and contacts
City, State (County) Olla, LA 71465   (La Salle County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Construction Documents
Bids Due View project details and contacts
Estimated Value $250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a road / highway in Olla, Louisiana. Working plans call for site work for a road / highway. Type Improvement : Type Improvement : Upgrade RR Signals, Close Crossing, Improve Approach Length 0.04 miles) Parish : LaSalle Estimated Cost Range $100,000 to $250,000 As of June 24, 2022, the project is in Final Planning status. Anticipated letting date is June 30, 2022. LADOT - Up Several RR Xings (Olla) *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.Site work for a road / highway in Olla, Louisiana. Working plans call for site work for a road / highway. Type Improvement : Type Improvement : Upgrade RR Signals, Close Crossing, Improve Approach Length 0.04 miles) Parish : LaSalle Estimated Cost Range $100,000 to $250,000 As of June 24, 2022, the project is in Final Planning status. Anticipated letting date is June 30, 2022. LADOT - Up Several RR Xings (Olla) *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents