Similar Projects
2022 City Park CCTV and Investigations
Infrastructure
Bidding
Pittsburgh, PA

Lawn and Ophelia Green Infrastructure Project
Infrastructure
Bidding
Pittsburgh, PA 15213

Streets Run Storm Sewer Improvements
Post-Bid
Pittsburgh, PA 15236

Woodlawn and Fountain Storm Sewer Separation
Post-Bid
Crafton, PA 15205

Oliver Road Improvements
Results
Edgeworth, Sewickley, PA 15143

2020 Roadway and Storm Sewer Improvements
Results
Pittsburgh, PA 15227

Recreation Site Improvements Sewer Separation and Green Infrastructure
Infrastructure
Bidding
$100,000 est. value
Rankin, PA

Avonworth School District Parking Lot
Post-Bid
Pittsburgh, PA 15237

Fuehrer Road Landslide
Results
Less than $275,000 est. value
Elizabeth, PA 15037

Fitzrandolph Drive Storm Sewer Improvements
Infrastructure
Bidding
Coraopolis, PA 15108

2021 Capital Lining Program
Infrastructure
Post-Bid
Pittsburgh, PA

2020 Storm Sewer Improvements
Results
Sewickley, PA 15143

Mowry Park Storm and Sanitary Sewer CCTV Program
Infrastructure
Bidding
Pleasant Hills, PA

2021 Bauman Avenue Stormwater Program
Infrastructure
Post-Bid
Brentwood, PA 15227

9th Street Storm Water Project
Results
Less than $39,500 est. value
Clairton, PA 15025

Last Updated 03/08/2022 11:41 AM
Project Title

Old Coal Hollow Storm Sewer Project

Physical Address View project details and contacts
City, State (County) Penn Hills, PA   (Allegheny County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

CONTRACT A – FIPP LINING This project involves the installation of 15”, 18”, and 24” fold-in-place (FIPP) liner in the existing storm sewer including, pre-lining CCTV; NASSCO compliant post-lining CCTV; removal and replacement of storm sewer inlets; storm sewer wye replacement; asphalt trench restoration; and all traffic control and restoration of disturbed areas, complete in place. CONTRACT B – FULL LINE REPLACEMENT This project involves the full line replacement of the existing storm sewer including, removal and replacement of existing storm sewer with smooth lined corrugated plastic pipe (SLCPP); removal and replacement of storm sewer inlets; removal and replacement of storm sewer manholes; asphalt trench restoration; NASSCO compliant post-lining CCTV; and all traffic control and restoration of disturbed areas, complete in place.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents