Similar Projects
Mcalpine WAS Equalization Improvements
New Construction
Bidding
Pineville, NC 28134

210 Wastewater Treatment Facility Biosolids Dewatering Facility and Solids Handling Improvements
Renovation
Bidding
$17,000,000 to $20,000,000 est. value
Smithfield, NC

Residuals Management - Wastewater Treatment Division
Post-Bid
Gastonia, NC 28052

WWTP Improvements Contract I
Post-Bid
Mount Olive, NC 28365

Wastewater Treatment Plant Improvements - Filter Replacement
Results
$1,200,000 est. value
Hendersonville, NC

Northeast Brunswick Regional Wastewater Treatment Plant 2.5 MGD Expansion
Results
Leland, NC

Wastewater Treatment Plant Improvements
Renovation
Bidding
Pembroke, NC 28372

Mallard Creek WRF Phase 1 Improvements Construction Manager at Risk Services
Post-Bid
$89,200,000 est. value
Charlotte, NC

Big Buffalo Water Reclamation Facility Flood Rehabilitation Project
Results
Less than $4,500,000 est. value
Sanford, NC 27330

Henry Fork Wastewater Treatment Facility Biosolids Handling Facility
Renovation, Addition - 9,696 SF
Bidding
$25,000,000 to $30,000,000 est. value
Hickory, NC

McAlpine Creek WWMF Nutrient Harvesting
Post-Bid
$13,000,000 est. value
Charlotte, NC

West Stanly (NC) WWTP and Sanitary Sewer Improvements SRF
Results
Oakboro, NC 28129

Wastewater Treatment Plant and Lift Stations Improvements
Renovation
Bidding
$1,100,000 est. value
Pilot Mountain, NC 27041

Phase 3 Sanitary Sewer Treatment Plant and Collection System Improvements - Division A
Renovation
Post-Bid
Enfield, NC

Wastewater Treatment Plant Influent and Headworks Screen Upgrades Project
Results
$252,000 est. value
Clarkton, NC 28433

Last Updated 11/03/2021 10:47 AM
Project Title

Elizabeth City Raw Water Reservoir and WTP Upgrades

Physical Address View project details and contacts
City, State (County) Elizabeth City, NC 27906   (Pasquotank County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of replacing the five filtered water turbidity analyzers; programming and upgrades to the existing SCADA system to add the new turbidity analyzers; replacing the combined filtered water sample pump; rehabilitation of the existing five gravity filters including filter media replacement and concrete repair and coating work; installation of vertical turbine flocculators, support bridges, controls, variable frequency drives (VFDs), and stainless steel baffle walls in the two flocculator basins; upgrading the existing 3.0 million gallons above ground, open air, rectangular, concrete Raw Water Reservoir including concrete repair and coating work, installation of an anti-vortex collar on the existing outlet pipe and trashrack bar guards on the overflow pipes, and the installation of floating ball reservoir cover; including all electrical work; and all else required at the City’s Water Treatment Plant. The foregoing description shall not be construed as a complete description of all work required.

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents