Similar Projects
Manor Commons SE Commercial Lot - Shared Driveway with DQ Grill & Chill
Design
Manor, TX 78653

Water Treatment Plant Expansion
Addition
Design
Pflugerville, TX

Local Mobility ADA Sidewalk and Ramp IMPS Grp 28 IDIQ City Wid
Infrastructure
Bidding
$15,000,000 est. value
Austin, TX

Forest Bluff Row Improvements
Infrastructure
Bidding
$850,000 est. value
TX

Installation of Fiber Optic Line Between the Uplands Water Treatment Plant and the Raw Water Intake Station for West Travis County Public Utility Agency
Post-Bid
Austin, TX 73301

Agriculture Complex Meat Lab Parking Lot
Alteration
Post-Bid

Beachside Redevelopment at Galveston Island State Park
New Construction
Results
$11,625,000 to $13,440,000 est. value
Austin, TX 78744

ADA Ramp and Bus Stop Improvements 2021 Citywide IDIQ
Term Contract
Results
$1,500,000 est. value
Austin, TX

George Washington Carver Museum Cultural and Genealogy Center Phase 2A Site Utilities
Renovation, Addition, Build-Out, Infrastructure
Design
$5,100,000 est. value
Austin, TX 78702

Uplands WTP Trident/Office Building and High Service Pump Station Building Renovations
Renovation
Bidding
$1,750,000 to $2,250,000 est. value
Bee Cave, TX

Water Treatment Plant Membrane Filtration System Suppliers
Renovation
Post-Bid
Pflugerville, TX 78691

Treatment Plant & Utility System Improvements
Results
Lago Vista, TX 78645

IH 35 - Construct Pedestrian Infrastructure
Infrastructure
Bidding
$4,256,955 est. value
TX

Concrete Sidewalk Removal and Replacement
Term Contract
Post-Bid
$90,000 est. value
Pflugerville, TX

Sherman Parking Lot Repair
Results
Austin, TX

Last Updated 04/01/2022 07:46 AM
Project Title

Ullrich WTP Process Drain and Support Systems Improvements

Physical Address View project details and contacts
City, State (County) Austin, TX 78746   (Travis County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sidewalks/Parking Lot, Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $11,480,495
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of: 1. Parking Lot Improvements: Provide 25 additional perpendicular parking spaces off the plant road in front of the administration building. Restripe one visitor parking space such that one more of the parking spaces is identified as accessible (for a total of three accessible spaces). Also provide covered parking for 4 (four) utility carts. 2. Raw Water Pump Replacement and New Electrical Building: Replace raw water pumps, piping, and valves in the Sludge Handling Facility. Replace the controls and instrumentation on the existing hydropneumatics tank. The work includes all electrical and SCADA work and includes the construction of a new poured concrete electrical building and new ductbanks. Work shall also include bypass pumping during construction to maintain raw water capacity for plant operations. 3. Raw Water Piping Improvements: Raw water piping improvements include a 6” water line from the Sludge Handling Facility to the Sludge Thickener Pump Station and a 12” suction line to the Sludge Handling Facility from Valve Vault No. 9. Work also includes the replacement of a 48” steel tee and a 36” steel fitting in Valve Vault No. 9 to accommodate resizing the raw water pump suction line from an 8” diameter line to a 12” diameter line. 4. Sludge Change-Over Facility: Construct a new Sludge Change-Over Facility, including all piping, valves, appurtenances, electrical and SCADA work, site piping, and poured-concrete building. Work shall include all specified piping rehabilitation, electrical work, and structural work on the Existing Sludge Thickener Pump Station. Work shall also include reconnecting piping from the existing Sludge Change-Over Vault to the new facility and any temporary piping required to maintain plant sludge processing operation. 5. Spill Containment Structure: Construct a concrete containment basin including slide gates, electrical and SCADA work, sitework, gratings and railings. Work includes constructing overflow piping from the plant drain sump lift station to the containment basin and installation of new stormwater piping and manholes to and from the new containment basin to the outfall manhole. 6. Centrifuge Building Fixtures Improvements: Install new 6” potable water line and new fixtures in the Centrifuge Buildings including two new Emergency Shower/Eye-Wash Stations, a new stainless sink and two new hose bibs. The 6- inch waterline will extend along the north service road, connecting the existing plant waterline on the northwest side of the plant to the Centrifuge Building. The waterline will continue from the Centrifuge Building to the existing waterline on the northeast side of the plant, providing the plant with a looped water system. 7. Plant Air System Improvements: Install additional air valves throughout the facility. Replace the compressed air line from Clearwell No. 1 to the Medium/High Service Pump Station. 8. Equipment/Piping Demolition in Administration Building: Demolish abandoned service water pumps, piping, hydropneumatics tank, controls and conduit in the basement of the Administration Building. Provide blind flanges, valves and other appurtenances as specified.

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wells, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents