Similar Projects
Lakeside At Trappe Master Plan
New Construction
Design
Trappe, MD

Cox Creek Water Reclamation Facility ENR Miscellaneous Improvements
Renovation
Bidding
$1,500,000 to $2,000,000 est. value
Annapolis, MD

Repair of Steam Sterilization Plant, Fort Detrick, MD
Post-Bid
$25,000,000 to $100,000,000 est. value
Fort Detrick, MD

Water Treatment Service Contract
Post-Bid
College Park, MD 20742

Multi-Step-Potomac WFP High Zone Pumps 7 and 8 LCI Drives Replacements
Results
Potomac, MD 20854

Town Water Treatment Plant Emergency Backup Generator
Results
Union Bridge, MD 21791

Post-Hypochlorite and Fluoride Monitoring Annapolis Water Treatment Plant
Post-Bid
Annapolis, MD 21401

Floc Log Pilot Test Cox Creek Dredged Material Containment Facility
Term Contract
Results
Baltimore, MD 21226

Wastewater Treatment Plant Sludge Bed Rehabilitation
Post-Bid
Betterton, MD

Arnold WTP Lime System Upgrade
Results
$3,000,000 est. value
Annapolis, MD 21401

Potomac WFP Solids Handling Building Upgrade
Renovation
Post-Bid
$3,000,000 to $6,000,000 est. value
MD

Cox Creek DMCF Concrete Pole Installation and Aggregator Pole Relocation
Results
Orchard Beach, MD 21226

Stevensville Water Treatment Plant
New Construction
Post-Bid
Stevensville, MD 21666

Yourtee Springs Upgrade Project
Renovation
Results
Knoxville, MD 21758

Acid Mine Drainage System Maintenance Service
Term Contract
Post-Bid
Less than $50,000 est. value
Frostburg, MD

Last Updated 11/02/2021 01:48 PM
Project Title

Multi-Step IFB BF7020A21 - Potomac WFP Finished Water Reservoir No 3

Physical Address View project details and contacts
City, State (County) Potomac, MD 20854   (Montgomery County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Engineering and construction department requires the rehabilitation of finished Water Reservoir No 3. The work will include the replacement of all floor joints with the Combiflex system, replacement of join sealant in the wall that contraction joints, replacement of the joint filler at the top of the wall which it interfaces with the roof and patching of spalls on the concrete surface.

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents