Similar Projects
SR 11 over East Branch Martins Creek
Demolition, New Construction, Infrastructure
Conception
$1,175,000 CJ est. value
Kingsley, PA 18826

SR 11 over East Branch Martins Creek
Demolition, New Construction, Infrastructure
Conception
$1,175,000 CJ est. value
Kingsley, PA 18826

SR 247 over Dundaff Creek
Demolition, New Construction, Infrastructure, Renovation
Design
$1,601,000 CJ est. value
Clifford Township, PA 18421

SR 247 over Dundaff Creek
Demolition, New Construction, Infrastructure, Renovation
Design
$1,601,000 CJ est. value
Clifford Township, PA 18421

Dirt and Gravel Roads Howard Hill Road Project
Infrastructure
Post-Bid
Hallstead, PA 18822

Milling and Paving of Certain Streets
Infrastructure
Post-Bid
$200,000 est. value
New Milford, PA

SR 171 Slide
Infrastructure
Results
$1,000,000 to $2,499,999 est. value
PA

Wright Road Bridge Replacement
Renovation
Results
$300,000 est. value
PA

I-81 Susquehanna Project - Susquehanna County
Infrastructure, Renovation
Pending Verification
$200,000,000 CJ est. value
New Milford, PA 18834

I-81 Susquehanna Project - Susquehanna County
Infrastructure, Renovation
Pending Verification
$200,000,000 CJ est. value
New Milford, PA 18834

SR 492 over Little Butler Creek
Infrastructure, Renovation
Conception
$1,405,000 CJ est. value
New Milford, PA 18834

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$1,961,171 CJ est. value
Franklin Township, PA 16001

Asphalt Paving At 8 LNA Sites
Term Contract
Post-Bid

Campground Road Project
Infrastructure
Results
$142,500 CJ est. value
Dimock Township, PA 18844

Bolles Compressor Station -
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Bridgewater Township, PA 18801

Last Updated 08/15/2023 11:32 PM
Project Title

Bradford County Bridge No. 8 Emergency Repair Project: T-328 (Bronson Road) Over Sugar Creek

Physical Address View project details and contacts
City, State (County) New Milford, PA 18834   (Susquehanna County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $550,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Each BID must be accompanied by a Bid Bond payable to the Owner for ten percent (10%) of the total amount of the BID. As soon as the BID prices have been compared, the Owner will return the Bonds of all except the three lowest responsible bidders. When the Agreement is executed, the bonds of the two remaining unsuccessful bidders will be returned. Bidders must submit with their initial bid, a statement as to whether they have previously performed work subject to the President's Executive Order No. 11246 (30 F.R. 12319-25) "Equal Opportunity Clause". The Bidder acknowledges that this bid is for a public works contract and bidder is therefore subject to the provisions, duties, obligations and penalties of the Public Works Employment Verification Act, 43 P.S. 167.1 - 167.11, which is incorporated herein by reference. The Owner reserves the right to reject any or all bids, to waive any informalities in the bidding, or to limit the scope of work involved. No bidder may withdraw a bid within sixty (60) days after the actual date of the opening thereof. Should there be reasons why the contract cannot be awarded within the specified period; the time may be extended by mutual agreement between the Owner and the Bidder. All Contractors must be PennDOT prequalified. All Contractors shall comply with all State and Federal laws prohibiting discrimination in hiring employment opportunities. PA prevailing wage rates do not apply to this contract.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents