Similar Projects
Removal and Disposal of Existing Metal Lockers and Install New Heavy Duty Metal Corridor Lockers
Bidding
Dorchester, MA

Goessmann Hall 2nd Floor Renovation Project - Filed Sub Bids
Post-Bid
Less than $11,200,000 est. value
Boston, MA 02108

Wall Tile Instillation at the ELC
Post-Bid
Chelsea, MA 02150

Replace Ceiling System In Institutional Kitchen
Results
Less than $45,000 est. value
Boston, MA

12 Channel Street Operations Center - General Bid
Results
Less than $1,996,916 est. value
Boston, MA

Evaluation and Replacement of Handrails in Public Buildings
Post-Bid
Less than $30,000 est. value
Chelsea, MA 02150

State House Water Infiltration Repairs - General Bids
Results
Less than $4,890,688 est. value
Boston, MA 02108

Replace Section of Kitchen Ceiling Approx. 520 Sq. Ft.
Post-Bid
Less than $20,000 est. value
Boston, MA

State House Water Infiltration Repairs - Filed Sub-Bids
Results
Less than $4,890,688 est. value
Boston, MA 02108

Water Intrusion and Floor Repair - Green Line Riverside Car House
Post-Bid
Less than $160,000 est. value
Boston, MA

Paris Street Pool Renovations - Sub-Bids
Results
Less than $7,600,000 est. value
East Boston, MA 02108

Doris Bunte RAD Conversion - Filed Sub Bids
Post-Bid
Boston, MA

Boston Common Garage 2020 Low Roof Repairs - Filed Sub-Bids
Results
Less than $4,300,000 est. value
Boston, MA

Street Botolph RAD Conversion - Filed Sub-Bid
Post-Bid
Boston, MA

Refinishing of Hatch Shell
Results
Less than $275,000 est. value
Boston, MA

Last Updated 09/03/2020 10:15 AM
Project Title

Second Floor Kitchen and Bath Renovations

Physical Address View project details and contacts
City, State (County) Winthrop, MA 02152   (Suffolk County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $65,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of: Second Floor kitchen and bath renovations including replacement of kitchen cabinets & counters, entry door & sidelight, and replacement of existing bathtub with new walk-in shower.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 09 - Finishes, Painting.
Division 11 - Equipment, Residential Appliances.
Division 22 - Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents