Similar Projects
Lesterville Bank Stabilization Missouri River Mile 816.5 Yankton County, SD
Design
$250,000 to $500,000 est. value
SD

2021 Sheet Pile Dam Repairs on Elm River
Infrastructure
Bidding
$350,000 to $500,000 est. value
Aberdeen, SD

Drainage Improvements - USD Sanford School of Medicine
Infrastructure
Bidding
$183,000 est. value
Sioux Falls, SD 57105

Robbinsdale Drain Sediment Removal
Post-Bid
Rapid City, SD

East 1st Street Extension
Post-Bid
$4,000,000 est. value
Tea, SD 57064

Box Culvert
Results
Less than $412,357 est. value
Junius, Madison, SD 57042

Basin 104 Drainage Improvements
Results
$3,680,000 est. value
Sioux Falls, SD 57106

Box Culvert Project
Infrastructure
Bidding
$580,000 to $700,000 est. value
Milbank, SD

Replacing Existing Main Distribution Areas - Water Department and Installation of Flood Wall Berm at Pelican Sub - Electric Department
Post-Bid
Watertown, SD

Split Rock Creek Bank Stabilization
Results
$360,000 est. value
Brandon, SD 57005

2021 Street Maintenance Concrete Repair II
Alteration
Bidding
Aberdeen, SD

FEMA Storm 4463 Culvert Replacement
Post-Bid
$1,291,327 est. value
Eagle Butte, SD

Manderson Pathway
Results
$1,214,346 to $1,274,496 est. value
Pine Ridge, SD

Concrete
Alteration
Bidding
Rosebud, SD

BIA Route 2 and 12, FEMA 4467 Culvert Replacement
Post-Bid
$2,189,900 est. value
Eagle Butte, SD

Last Updated 08/07/2021 02:40 AM
Project Title

BIA Site Numbers 802-1 and 802-2 Reinforced Concrete Poured In Place

Physical Address View project details and contacts
City, State (County) Eagle Butte, SD   (Dewey County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Concrete, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A0150000-ERFO SD2019-1-BIA Site Numbers 802-1 and 802-2 Installation of a 84 foot 36” reinforced concrete pip (rcp) with flared ends and include excavation, partially grouted riprap, clearing, gravel surfacing, placing topsoil, traffic control, and erosion control quantities of which are indicated in the bid form. the project is generally located at mile marker 6.7 on bia route 802, approximately 17.22 southeast of eagle butte, sd. installation of 88 foot, 36” reinforced concrete pipe (rcp) with flared end and included excavation, clearing, riprap gravel surfacing, placing topsoil, traffic control, and erosion control quantities of which are indictated in the bid form. the project is generally located at mile marker 8.7 on bia route 802, approximately 18.96 miles southeast of eagle butte, sd

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 31 - Earthwork, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents