Similar Projects
Last Updated | 10/19/2022 10:42 AM |
Project Title | Parker Street Trail Connection |
Physical Address | View project details and contacts |
City, State (County) | Newburyport, MA 01950 (Essex County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Contract Award, Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $299,843 [brand] Estimate |
Plans Available from | Municipal Agency - 07/14/22 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Town of Newbury is seeking written quotes to perform shared use path construction along approximately 350-feet of Parker Street. The Work includes, but is not limited to, hot mix asphalt shared use path construction; installation of granite curbing; mill and overlay of existing pavement; earthworks; hot mix asphalt paving; timber guardrail installation; wood rail fence installation; erosion control; installation of drainage structures and pipes; adjusting utility castings; fine grading; installation of structural soil; loaming and seeding; traffic management; and planning/coordinating with National Grid for electric infrastructure improvements. The Town shall only accept and open bids from prospective bidders that are prequalified in the appropriate category of work by MassDOT. MassDOT prequalification of contractors with the class of work as, Highway - Bike Paths or Highway - Sidewalk & Curbing, for the project with an estimated value of $234,497.25 will be required. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |