Similar Projects
Reindahl Restroom Remodel
Renovation
Conception
$86,000 est. value
Madison, WI 53704

Village Green Park Restrooms
New Construction - 550 SF
Conception
Oconomowoc, WI 53066

Whitnall Pointe Apartments
New Construction, Renovation, Addition, Demolition
Design
$1,052,726 est. value
Franklin, WI 53132

Bucyrus Commons
New Construction
Bidding
$2,300,000 est. value
South Milwaukee, WI 53172

Toilet & Shower Room GPC
Renovation
Bidding
$2,600,000 est. value
Oshkosh, WI 54901

Interurban Trailhead Restroom/Shelter
Post-Bid
Watertown, WI 53094

Tactical Training Build-Out and T Building: New Restroom Renovations
Renovation, Build-Out
Post-Bid
Pewaukee, WI 53072

Liberty Park Shelter and Bathroom
Results
Less than $315,000 est. value
Sun Prairie, WI 53590

City Park Toilet Expansion
Addition - 538 SF
Results
Reedsburg, WI 53959

Apostle Islands Area Campground Expansion
New Construction
Pending Verification
Bayfield, WI 54814

Toilet & Shower Room MEP
Renovation
Bidding
$2,600,000 est. value
Oshkosh, WI 54901

Waaswaaganing Indian Bowl - Toilet Room Upfit
Renovation
Post-Bid
Lac du Flambeau, WI 54538

Shower Repairs
Renovation
Results
Less than $236,600 est. value
Racine, WI

Group Campground Bath House Addition
Renovation, Addition - 1,008 SF
Bidding
Highland, WI

Iron County Fair Restroom Building
New Construction - 720 SF
Post-Bid
Saxon, WI 54559

Last Updated 02/25/2022 06:05 PM
Project Title

Northwest Restrooms Facility Replacement GPC

Physical Address View project details and contacts
City, State (County) West Allis, WI 53214   (Milwaukee County)
Category(s) Entertainment/Recreation
Sub-Category(s) Restroom/Bath House
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,336,300
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general the work consists of demolishing the existing 3,000 square foot Northwest Restroom facility and constructing a new unheated 3,500 square foot restroom building with site improvements

Details

,, 6,500 SF - 1 Restroom/Bath House, 3,000 SF Demolition, 1 Restroom/Bath House, 3,500 SF New Construction.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents