Similar Projects
New Fire Station
New Construction
Conception
Clinton, ME

Gorges Road Fire Station Expansion
Addition
Post-Bid
Kittery, ME 03904

Maritime Academy Bucksport Fire Training Facility
Renovation
Post-Bid
Bucksport, ME 04416

Lewiston Fire Sub-station
Results
Less than $4,300,000 est. value
Lewiston, ME 04240

Construction of Brunswick Fire Station
New Construction - 25,361 SF
Results
Brunswick, ME

Design-Build Contractors for the New Fire Sub-station
New Construction - 5,000 SF
Construction
Less than $1,000,000 est. value
Wells, ME

Public Safety Building Addition and Renovations
Renovation, Addition
Construction
Windham, ME

Compressor and Fill Station
Renovation, Alteration
Post-Bid
Falmouth, ME

Biddeford Fire Department Dorm Room Renovations
Renovation
Results
Biddeford, ME 04005

Eliot Police Department Building Repair
Renovation
Post-Bid
$200,000 est. value
Eliot, ME 03903

Skowhegan Public Safety Building
New Construction
Results
Skowhegan, ME 04976

RFQ D/B - New Fire Station
New Construction
Post-Bid
$3,500,000 est. value
Orland, ME 32824

Fire Department Bathroom Renovation
Renovation
Results
Andover, ME

Ocean Avenue Fire Station Roof Replacement
Renovation
Post-Bid
$417,000 CJ est. value
Portland, ME 04103

Design Build Project-Sebago Public Safety Building
New Construction
Results
Sebago, ME

Last Updated 08/17/2022 12:34 PM
Project Title

Stair and Building Envelope Improvements

Physical Address View project details and contacts
City, State (County) Portland, ME 04101   (Cumberland County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $150,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work under this Contract includes but is not limited to the following: Interior demolition and cleanup: new GWB partitions; (8) new doors, frames & hardware; Alteration to acoustical ceilings; minor alterations/relocation of sprinkler heads; painting/repainting all surfaces in the work area; installation of ADA compliant casework at the kitchenette; relocation and installation of existing lockers. Work by others (Not in contract): Work completed by others, in coordination with above work includes: Electrical power, lighting and fire alarm work All questions shall be directed in writing ONLY to the Purchasing Office at the above address and be received at least five business days prior to the bid opening date (FAX 207-874-8652, or email krc@portlandmaine.gov . Responses from the City that substantially alter this bid will be issued in the form of a written addendum to all bid holders registered in the Purchasing Office. Oral explanations or interpretations given before the award of the contract will not be binding

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents