Similar Projects
Brookview Village - Expansion Phase III
Infrastructure
Design
$500,000 to $1,000,000 est. value
Greenfield Center, NY 12833

2021 Water Main Lining and Lead Service Replacement
Bidding
$2,800,400 est. value
Rochester, NY

Smart AMI Water Meter System
Infrastructure
Bidding
Yorktown, NY

Pipes, Fittings, Hydrants and Valves
Post-Bid
Saratoga Springs, NY 12866

Corliss Pump Station Improvement Project Valve Installations
Post-Bid
Rensselaer, NY 12144

Shared Water Improvements
Results
Less than $115,000 est. value
Champlain, NY

Water System Improvements Town of Cheektowaga
Results
Cheektowaga, NY 14043

Fire Hydrants
Infrastructure
Bidding
NY

Lafayette Avenue Rehabilitation
Post-Bid
Geneva, NY 14456

Water System Improvements in the Towns of Amherst and Cheektowaga
Term Contract
Results
Amherst, Cheektowaga, NY

Fire Hydrant
Infrastructure
Bidding
New York, NY

Pipe , Culvert, Valves and Fittings
Term Contract
Post-Bid
$50,000 to $500,000 est. value

Test and Repair Standpipe Systems, RPZ Valves, Sprinkler Systems, Fire Hydrants, Water Meters and Elevated Gas Pressure Meters
Term Contract
Results
White Plains, NY 10605

Ontario, Cooper, Lockport, and Franklin Streets Waterline Replacement
Infrastructure
Bidding
Olcott, NY 14126

Village of Schoharie Intake Line Replacement
Post-Bid
Less than $150,000 est. value
Schoharie, NY 12157

Last Updated 09/09/2021 04:26 PM
Project Title

Water and Wastewater Improvements

Physical Address View project details and contacts
City, State (County) Greenville, NY   (Greene County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists generally of construction of approximately 2500-feet of sewer mains, 2500-feet of 10" water main, 2500 feet of 4" water main, Construction of approximately 2500-feet of 8" water main furnishing and installing one new metering vault and one new PRV vault, furnishing and erecting a 184,000 gallon water storage tank (including all associated electrical work, controls and instrumentation) and an approximately 800-foot access road leading to the proposed water storage tank.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents