Similar Projects
Carnahan Canal Renovations at Witte Museum
Renovation
Design
San Antonio, TX 78209

Morgan Meadows Units 2B, 3A & 3B and Morgan Heights - Phase 1B
Infrastructure
Bidding
San Antonio, TX 78275

Bexar County Urban Farm Phase II Project
Infrastructure
Bidding
TX

J065--Neptune Surgical Waste Management SMA
Post-Bid
San Antonio, TX 78229

Architecture and Engineering Environmental Services for The United States Air Force (Ae Es 2020)
Post-Bid

La Providencia Exterior Rehabilitation and Site Improvements
Results
San Antonio, TX 78237

Park Restrooms/ Mechanical Room Project
New Construction
Results
Shavano Park, TX 78231

Quiktrip #4068 - Phase II Sanitary Sewer Work
New Construction
Construction
San Antonio, TX 78253

Vertical Construction Multiple Award Task Order Contract
New Construction, Addition
Post-Bid
$75,000 to $640,140,000 est. value

Bus Pit Rehabilitation Phase II A - Pit 7
Results
Less than $74,373 est. value
San Antonio, TX 78200

Thea Meadows Unit 4 Subdivision
Post-Bid
San Antonio, TX 78275

Waterline Improvements and Well Site Development
Results
$3,104,000 est. value
Elmendorf, TX 78112

Morgan Meadows Units 1A, 1B, and 2A and Morgan Heights Phase 1A Subdivisions
New Construction
Post-Bid
San Antonio, TX 78253

Agrilife Greenies Urban Farm Project
Results
Less than $231,668 est. value
San Antonio, TX 78202

HEB - Turn Lane Improvements
Post-Bid
San Antonio, TX

Last Updated 07/21/2021 08:59 AM
Project Title

Paso Del Norte Street (Shady Oaks)

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78232   (Bexar County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,579,900
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work will improve 3 low water crossings and 2 ponding areas in and around Paso Del Norte Street in the Shady Oaks Neighborhood. Two crossings will have the existing RCP removed and will install two 4ft by 2 ft box culverts. One location will involve regrading the street to prevent ponding. One location will have the existing RCP removed and a bridge will be constructed utilizing precast concrete girders with cast-in-place decorative concrete traffic barrier. The last location will involve grading a grass swale on private property to prevent street ponding on the roadway and improve drainage. Rip rap at various locations may either be concrete or rock as shown on the plans. Additionally, there will be joint bid SAWS Water and Sewer improvements on Paso Del Norte and Rio Seco. Tree removal will occur as part of the preparation of the ROW; care will need to be taken to prevent the spread of Oak Wilt.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents