Similar Projects
Accurate Lock & Hardware
Addition - 18,000 SF
Conception
Stamford, CT 06902

Broad Brook Road Offices
Renovation
Conception
Enfield, CT

5 Unit Office Building
New Construction - 6,000 SF
Design
Bolton, CT 06043

Mixed-Use Development
New Construction
Design
Shelton, CT 06484

Property Offered for Redevelopment 110 Washington Street
Bidding
Hartford, CT 06106

Building Facade Improvement Project
Renovation
Post-Bid
New London, CT

Southfield Office
New Construction - 3,300 SF
Post-Bid
$500,000 to $1,000,000 CJ est. value
Newington, CT 06111

Development Proposal - 140 Main Street (Route 12)
Renovation
Results
Killingly, CT 06239

Request for Developer
Results
East Haddam, CT 06468

Courtland Arms
Renovation - 25,645 SF
Construction
$2,635,236 est. value
New Britain, CT 06051

Beaton & Corbin Redevelopment
New Construction - 13,000 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Southington, CT 06489

Meriden Green
New Construction
Pending Verification
Meriden, CT

Greenwich Plaza Revitalization
Renovation
Pending Verification
Greenwich, CT

Founders Plaza
New Construction, Renovation - 244,000 SF
Conception
Hartford, CT 06108

Hale Mill Hotel
Renovation - 111,300 SF
Design
Norwich, CT

Last Updated 12/31/2020 01:22 PM
Project Title

Camp Wah-nee

Physical Address View project details and contacts
City, State (County) Winchester, CT 06790   (Litchfield County)
Category(s) Commercial
Sub-Category(s) Office
Contracting Method
Project Status Construction Complete as of fourth quarter 2020
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Office, 3,779 SF New Construction, Demolition.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents