Similar Projects
Main Street Fire Station Replacement Project - City of Lewiston
Demolition, New Construction, Infrastructure
Conception
$4,002,093 CJ est. value
Lewiston, ME 04240

Canal Street Parking Garage Building Repairs - City of Lewiston
Renovation, Infrastructure
Conception
$600,000 CJ est. value
Lewiston, ME 04240

Picker House Lofts
Infrastructure, Renovation
Design
$22,400,000 CJ est. value
Lewiston, ME 04240

Redundant Water Transmission Main Installation - City of Lewiston
Infrastructure
Design
$5,500,000 CJ est. value
Lewiston, ME 04241

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Haley Street, Warren Ave, and Webber Ave Water Main Replacement
Infrastructure
Bidding
$800,000 CJ est. value
Lewiston, ME 04240

Paving and Catch Basin Improvements at Family Development
Infrastructure
Post-Bid
$1,500,000 CJ est. value
Auburn, ME 04210

Paving and Catch Basin Improvements at Family Development
Infrastructure
Post-Bid
$1,500,000 CJ est. value
Auburn, ME 04210

Statewide Geotechnical Drilling
Infrastructure
Results

Fairlawn Avenue Water Main Replacement and Road Rehab
Infrastructure
Results
Lewiston, ME 04240

Walgreens - Main Street / Lewiston
New Construction, Infrastructure - 3,834 SF
Pending Verification
$825,000 CJ est. value
Lewiston, ME 04240

Strawberry Avenue Self-Storage
New Construction, Infrastructure - 28,400 SF
Pending Verification
$3,000,000 CJ est. value
Lewiston, ME 04240

Lewiston Public Works Fueling Station Design and Construction - City of Lewiston
New Construction, Infrastructure
Conception
$2,321,000 CJ est. value
Lewiston, ME 04240

Brickyard Commons - Auburn
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
Auburn, ME 04210

2023 Reconstruction Project
Infrastructure
Bidding
$200,000 CJ est. value
Auburn, ME 04210

Last Updated 03/21/2023 03:30 PM
Project Title

Gully Brook Drainage Area - City of Lewiston

Physical Address View project details and contacts
City, State (County) Lewiston, ME 04240   (Androscoggin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2026
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Gully Brook drainage area covers 630 acres of land from Vale St to the Androscoggin River. * Storm water piping which converges at the Public Works yard into a single pipe connecting to a stone arch under the Pepperell Mill. - CSO improvements removed flow out of the sewers and added flow to the drainage system. * Funding for FY24 would provide for a consultant to develop a Storm Water Management Model (SWMM) model of the drainage system to evaluate the current capacity and determine/compare options to improve the capacity. FY25 funding includes final design work and construction. As of March 21, 2023, this project is included in the City of Lewiston's FY 2024-2028 CIP and funding is allotted for FY 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents