Similar Projects
Pinkney Fuel Site Replacement Construction Management at Risk Services
Bidding
Sarasota, FL

Building #26 Gas Piping Repair Project
Post-Bid
Sarasota, FL

500 Gallon Diesel Tanks
Post-Bid
Port Saint Lucie, FL 34984

Replacement of Emergency Standby Generator, Fuel Tanks and ats Along Florida'S Turnpike-South Region
Term Contract
Results

Replacement of Emergency Standby Generator, Fuel Tanks and ats Along Florida'S Turnpike-South Region
Term Contract
Results

Aircraft Self Fueling Facility
Construction
Less than $842,911 est. value
FL

15400 Gallon Hydroxide Tank Disposal
Post-Bid
Boynton Beach, FL 33425

Sodium Hypochlorite Tank Replacement
Results
Boynton Beach, FL

Fuel Farm Relocation
Results
Less than $791,000 est. value
Marianna, FL

Hillcrest Well Site - Hydropneumatic Tank Replacement
Results
FL

ATC Campus Thermal Energy Storage Tank and Site Work
Results
Daytona Beach, FL 32100

Fuel Tank Project Brandon Campus
Results
Less than $65,000 est. value
Tampa, FL

Fuel System Inspection and Repair Services
Term Contract
Results
Less than $250,000 est. value
Dania, Fort Lauderdale, Hollywood, Pembroke Pines, Pompano Beach, FL

Replace Double Wall Fuel Line
Results
$100,000 to $250,000 est. value
Panama City, FL 32403

Airport Fuel Farm Replacement
Results
West Palm Beach, FL

Reported 05/15/2019 12:00 AM
Project Title

Fuel Management System Replacement/Upgrade

Physical Address View project details and contacts
City, State (County) Panama City, FL   (Bay County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Include all parts and equipment, installation labor, configuration and testing, and final inspection at Northwest Florida Beaches International Airport, 6300 West Bay Parkway, Panama City, FL 32409. Replace existing Gas Boy fuel management system with a Fuel Master Fuel Dispensing and Management system, or equivalent, to allow for the accurate, monitored, supported, and software upgrade able system for the dispensing of fuel at the Northwest Florida Beaches International Airport. All system components shall be supplied and installed in a manner to be networked and compatible with existing Airport computer servers. All installed equipment shall allow for supported system software upgrades when applicable. The scope of work shall provide for the secure access, dispensing and monitoring of fuel at existing fuel pump stations on Northwest Florida Beaches International Airport property. The acquisition, delivery, installation, configuration, testing, and final inspection of equipment
Details
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents