Similar Projects
Maco Addition
Addition, Infrastructure - 7,800 SF
Conception
$4,200,000 CJ est. value
Shelby, NC 28150

Maco Addition
Addition, Infrastructure - 7,800 SF
Conception
$4,200,000 CJ est. value
Shelby, NC 28150

Cannon 35
New Construction, Infrastructure
Design
$275,000,000 CJ est. value
Kings Mountain, NC 28086

Cannon 35
New Construction, Infrastructure
Design
$275,000,000 CJ est. value
Kings Mountain, NC 28086

Kings Mountain Self Storage - Margrace Rd / Kings Mountain
New Construction, Infrastructure - 132,279 SF
Bidding
$14,200,000 CJ est. value
Kings Mountain, NC 28086

Raw Water Weir Improvements
Infrastructure
Bidding
$9,985,000 CJ est. value
Lawndale, NC 28090

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Transportation Asset Management Plan Resurfacing - Phase I
Infrastructure
Results
Shelby, NC

Milling, Resurfacing and Pavement Markings
Infrastructure
Results
NC

Cumberland Drive Stormwater Replacements
Infrastructure
Construction
$18,458 CJ est. value
Shelby, NC 28150

Cumberland Drive Stormwater Replacements
Infrastructure
Construction
$18,458 CJ est. value
Shelby, NC 28150

Patterson Homes
New Construction, Infrastructure
Pending Verification
$47,400,000 CJ est. value
Kings Mountain, NC 28086

Overlook and Trail Improvements at Crowders Mountain State Park - The North Carolina Parks and Recreation Authority
Infrastructure
Conception
$1,750,000 CJ est. value
Kings Mountain, NC 28086

Intersection Realignment
Infrastructure
Design
$1,000,000 CJ est. value
Shelby, NC 28150

Last Updated 07/06/2023 03:06 PM
Project Title

County Home Road

Physical Address View project details and contacts
City, State (County) Shelby, NC 28150   (Cleveland County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

THE PROJECT GENERALLY CONSISTS OF the furnishing of all materials, labor and equipment for the construction of a 0.055 mi two-lane curb & gutter roadway section and all associated work including, but not limited to, grading, drainage, paving, and curb & gutter. Each Bidder must be a Bidding Documents Holder as defined in Article 1 of the Instructions to Bidders. Bidders are encouraged to only secure project bid documents as noted above. Neither the City of Shelby nor the Engineer will be responsible for full or partial sets of Bidding Documents, including any Addenda, obtained from any source other than the Engineer and their representative plan provider, QuestCDN. Each Bidder shall be responsible for the review of all addenda for the project and shall acknowledge the addenda on the bid form. 5. The City of Shelby, North Carolina reserves the right to reject any or all Bids, and to waive all informalities not involving price, time, or changes in the Work. Questions received less than 7 days prior to the date for opening of Bids may not be answered.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents