Similar Projects
Roof Replacement of the Corwin House
Term Contract
Design
$100,000 to $250,000 est. value
Riverhead, NY 11901

Roof Repair
Alteration
Bidding
$500,000 est. value
West Sand Lake, NY 12196

Tuckahoe School, Asphalt Shingle Roof Replacement
Alteration
Bidding
$400,000 est. value
Southampton, NY 11968

Town of Roxbury Kirkside Park Barn Roof
Post-Bid
$40,000 to $50,000 est. value
Roxbury, NY

Cupola Repairs D'Youville Porter Campus School at Buffalo PS
Post-Bid
Buffalo, NY 14201

Replace Roofs at Charlton and STUAC, Buildings 45 and 08 at at College of Agriculture and Technology at SUNY Morrisville
Results
$2,500,000 to $5,000,000 est. value
Morrisville, NY 13408

ASRC Whiteface Mountain - Field Station Renovations
Results
Wilmington, NY 12997

Partial Roof Replacement Elmira Fire Headquarters
Alteration
Bidding
$800,000 est. value
Elmira, NY 14901

Town Office Road Roof Replacement
Post-Bid
Troy, NY 12180

Newark Public Library Roof
Results
Newark, NY 14513

Repair Roofs, A, B and B1, Saratoga Military Museum
Alteration
Bidding
$1,000,000 to $2,000,000 est. value
Saratoga Springs, NY 12866

Cool Insuring Arena Roof Replacement
Post-Bid
Glens Falls, NY 12801

Massena CSD 2019 Capital Improvements Phase 1 - Roofing
Results
Massena, NY 13662

Capital Improvements Phase 1 Contract # 2 Roof Reconstruction Island Trees High School
Alteration
Bidding
$500,000 est. value
Levittown, NY 11756

Gloversville ESD - Boulevard Elementary School 2020 Roof Replacement
Post-Bid
Less than $675,000 est. value
Gloversville, NY 12078

Last Updated 05/16/2022 06:51 AM
Project Title

Repair of Five Tub Roofs at The Saratoga County CF

Physical Address View project details and contacts
City, State (County) Ballston Spa, NY 12020   (Saratoga County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Areas #1 & # 2 – Each Roof Replacement is 130' x 8' (horizontal) + 130’ x 4’ (vertical) with six (6) scuppers (total) A. Remove the gutters at both roofs B. Install 4’ x 8’ sheets of 1.5” Poly Iso. Insulation on the vertical walls and fasten as needed. C. Install .060 EPDM on the vertical walls, 1’ onto the lower roof and 18” onto the upper roof. D. Install termination bars as needed. E. Cut the rubber approximately 12” above the roof deck (on the coping walls) and approximately 6” on the wall where the EPDM was installed. F. Remove all existing EPDM on the horizontal roofs (flat) down to the insulation. G. Remove all existing insulation and replace with 2 base layers of 3 inch. Poly Iso Insulation with a 1/4 inch per foot tapered insulation system on top and a ½ inch per foot cricket system to the scuppers. H. Fully adhere .060 EPDM Rubber Roofing System on the entire surface and run up under the EPDM on the walls. I. Flash all comers, pipes and the scuppers as needed. Area # 3 & # 4 – Each Roof Replacement 65' x 8' roof (horizontal only) with 3 (three) scuppers each. A. Cut the rubber approximately 12” above the roof deck (on the coping walls) and approximately 6” on the wall where the EPDM was installed. B. Remove all existing EPDM on the horizontal roofs (flat) down to the insulation. C. Remove all existing insulation and replace with 2 base layers of 3 inch. Poly Iso. Insulation with a 1/4 inch per foot tapered insulation system on top and a ½ inch per foot cricket system to the scuppers. S:\SHARE\BUILDINGS\PROJECTS\Sheriff & Correctional Facility\2022 Tub Roof Repairs\Project Manual\Technical Specs\2022 Technical Specs Correctional Facility Repair of 5 Tub Roofs.doc TS-2 D. Fully adhere .060 EPDM Rubber Roofing System on the entire surface and run up under the EPDM on the walls. E. Flash all comers, pipes and the scuppers as needed. Area # 5 – Roof Replacement is 65' x 8' (horizontal) + 65’ x 4’ (vertical) with three (3) scuppers A. Remove the gutters B. Install 4’ x 8’ sheets of 1.5” Poly Iso. Insulation on the vertical wall and fasten as needed. C. Install .060 EPDM on the vertical wall, 1’ onto the lower roof and 18” onto the upper roof. D. Install termination bars as needed. E. Cut the rubber approximately 12” above the roof deck (on the coping walls) and approximately 6” on the wall where the EPDM was installed. F. Remove all existing EPDM on the horizontal roofs (flat) down to the insulation. G. Remove all existing insulation and replace with 2 base layers of 3 inch. Poly Iso. Insulation with a 1/4 inch per foot tapered insulation system on top and a ½ inch per foot cricket system to the scuppers. H. Fully adhere .060 EPDM Rubber Roofing System on the entire surface and run up under the EPDM on the walls. I. Flash all comers, pipes and the scuppers as needed.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Elastomeric Membrane Roofing, Ethylene-Propylene-Diene-Monomer Roofing, Roof Specialties, Manufactured Gutters and Downspouts.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents