Similar Projects
Santa Fe Avenue and Mesa Avenue Streetscape (CDBG)
Bidding
Pueblo, CO 81008

Statewide Asphalt
Post-Bid

Indefinite Quantity (Idiq) Multiple Award Construction Contract (Macc) For Paving Projects At Various Government Installations Within The Navfac Sw Area Of Responsibility Including But Not Limited To California, Arizona, Nevada, Utah, Colorado, And New Mex
Post-Bid

Installation Of New Storm Sewer, Inlets, Manholes, Asphalt Patching, Concrete Patching
Results
$1,000,000 to $5,000,000 est. value
CO

Master Plan Design for Union Avenue and Main Street
Results
Less than $200,000 est. value
Pueblo, CO 81003

Street Rehabilitation Project - Fortino, Outlook, Greenwood & Eagleridge
Post-Bid
Pueblo, CO 81003

CO CRVFO Roads & Construction IDR 2020
Results
$25,000 to $150,000 est. value

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

CO LSFO Roads & Construction IDR 2020
Results
$25,000 to $40,000 est. value

Civil Site Work IDIQ for Interior Region 8
Post-Bid
$25,000 to $500,000 est. value
Glendale, Yuma, AZ

CO KFO Roads & Construction IDR 2020
Results
$25,000 to $170,000 est. value

Platteville Boulevard Turn Lanes
Results
Pueblo West, CO 81007

US 50 From Purcell Blvd to Pueblo Blvd
Results
$20,000,000 est. value
CO

Capistrano Turn Lanes
Results
Pueblo, CO 81007

Spaulding Roundabout
Results
$500,000 to $600,000 est. value
Pueblo West, CO 81007

Last Updated 07/09/2020 10:19 AM
Project Title

Pueblo West Safe Routes to School

Physical Address View project details and contacts
City, State (County) Pueblo, CO 81007   (Pueblo County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of constructing a trail (width varies from 6-feet to 10-feet) on the easterly side of S. McCulloch Boulevard, between Hahns Peak Avenue and Joe Martinez Boulevard; extend along the northerly side of Joe Martinez Boulevard between S. McCulloch Boulevard and Civic Center Drive; extend along the westerly side of Civic Center Plaza northerly towards Civic Center Park; extend along westerly along Civic Center Drive southerly towards Swallows Charter Academy; minor grading and traffic control. This work includes all labor, materials, and equipment necessary for the complete installation of the items.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents