Similar Projects
Middle Creek Regional Wastewater Pump Station, Force Main and Interceptor Sewer
New Construction
Bidding
Apex, NC 27539

Githens School Lift Station and Force Main
New Construction, Infrastructure
Bidding
$4,000,000 to $5,000,000 est. value
Durham, NC 27704

Poplin Road Pump Station Interim Improvements - Design Build Contract
Post-Bid
Monroe, NC 28112

Public Safety Building Lift Station
Post-Bid
Atlantic Beach, NC

Snow Hill Road Pump Station and Force Main Replacement
New Construction
Results
Less than $1,899,449 est. value
Durham, NC 27701

Groometown Road Water Booster Station
Results
Greensboro, NC

Eden Remediation Program Contract IIA - Bridge Street Pump Station Rehabilitation
Renovation
Bidding
Eden, NC

French Broad River Intake Pump Station Project
Post-Bid
$10,000,000 to $15,000,000 est. value
Hendersonville, NC 28792

Booster Pump Stations #1 and #2 Rehabilitation Project
Results
Troy, NC 27371

Randolph Road Industrial Park Sewer
New Construction, Infrastructure
Bidding
Shelby, NC 28150

Highway 75 Booster Pump Replacement
Term Contract
Post-Bid
Monroe, NC 28112

Pineview Lift Station Repair
Results
Less than $135,000 est. value
Havelock, NC 28532

Mount Holly Pumping Station and Forcemains Early Work Package 3
New Construction
Bidding
Charlotte, Mount Holly, NC 28120

Waxhaw Gravity Interceptor, Pump Station and Force Main
Post-Bid
$6,000,000 to $7,000,000 est. value
Monroe, NC

Frances Haven and Farmington Pump Station Decommissioning
Results
Less than $500,000 est. value
Harrisburg, NC 28075

Last Updated 01/13/2022 08:45 AM
Project Title

Sanitary Sewer Pump Station Rehabilitations Project

Physical Address View project details and contacts
City, State (County) Louisburg, NC   (Franklin County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing of all labor, materials, tools, and equipment for the construction of the following: Oak Ridge, No. 15 Pump Station: Replacement of existing pumps, motors, rails, piping, controls and panels, valves, belts, shives, within the existing Oak Ridge Pump Station, including new pressure transducer level control w/back up floats, clean existing wet-well and install a new wet-well lining/coating system, provide and install new valve vault, new meter vault with magnetic flow meter, new access hatches w/fall-thru protection devices, new pump hoist and base, new emergency pump-around connection, reconnection to relocated standby generator including new automatic transfer switch, new generator concrete pad, new stainless-steel hood to cover electrical panels, provide and install all associated conduit, wiring, SCADA system, testing and start-up, bypass pumping, site work, sedimentation and erosion control measures and all else required for a fully rehabilitated and operational Oak Ridge pump station, in accordance with the Construction Drawings and Contract Specifications. Highway 1-A, No. 16 Pump Station: Replacement of existing pumps, motors, rails, piping, controls and panels, valves, belts, shives, within the existing Highway 1A Pump Station, including new pressure transducer level control w/back up floats!, clean existing wet-well and install a new wet-well lining/coating system, install new piping and valves in existing valve vault, new meter vault with magnetic flow meter, new access hatches w/fall-thru protection devices, new pump hoist and base, reconnection to existing standby generator including new automatic transfer switch, new stainless-steel hood to cover electrical panels, provide and install all associated conduit, wiring, SCADA system, testing and start-up, bypass pumping, new fencing and gates, site work, sedimentation and erosion control measures and all else required for a fully rehabilitated and operational Highway 1A pump station, in accordance with the Construction Drawings and Contract Specifications. Korea Street, No. 17 Pump Station: Replacement of existing pumps, motors, rails, piping, controls and panels, valves, belts, shives, within the existing Korea Street Pump Station, including new pressure transducer w/back up floats, clean existing wet-well and install a new wet-well coating system, provide and install new valve vault, new meter vault with flow meter, new access hatches w/fall-thru protection devices, new pump hoist and base, new emergency pump-around connection, reconnection to relocated standby generator including new automatic transfer switch, new generator concrete pad, new stainless-steel hood to cover electrical panels, provide and install all associated conduit, wiring, SCADA system, testing and start-up, bypass pumping, new fending and gates, site work, sedimentation and erosion control measures and all else required for a fully rehabilitated and operational Korea Street pump station, in accordance with the Construction Drawings and Contract Specifications.

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents