Last Updated | 01/13/2022 08:45 AM |
Project Title | Sanitary Sewer Pump Station Rehabilitations Project |
Physical Address | View project details and contacts |
City, State (County) | Louisburg, NC (Franklin County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Furnishing of all labor, materials, tools, and equipment for the construction of the following: Oak Ridge, No. 15 Pump Station: Replacement of existing pumps, motors, rails, piping, controls and panels, valves, belts, shives, within the existing Oak Ridge Pump Station, including new pressure transducer level control w/back up floats, clean existing wet-well and install a new wet-well lining/coating system, provide and install new valve vault, new meter vault with magnetic flow meter, new access hatches w/fall-thru protection devices, new pump hoist and base, new emergency pump-around connection, reconnection to relocated standby generator including new automatic transfer switch, new generator concrete pad, new stainless-steel hood to cover electrical panels, provide and install all associated conduit, wiring, SCADA system, testing and start-up, bypass pumping, site work, sedimentation and erosion control measures and all else required for a fully rehabilitated and operational Oak Ridge pump station, in accordance with the Construction Drawings and Contract Specifications. Highway 1-A, No. 16 Pump Station: Replacement of existing pumps, motors, rails, piping, controls and panels, valves, belts, shives, within the existing Highway 1A Pump Station, including new pressure transducer level control w/back up floats!, clean existing wet-well and install a new wet-well lining/coating system, install new piping and valves in existing valve vault, new meter vault with magnetic flow meter, new access hatches w/fall-thru protection devices, new pump hoist and base, reconnection to existing standby generator including new automatic transfer switch, new stainless-steel hood to cover electrical panels, provide and install all associated conduit, wiring, SCADA system, testing and start-up, bypass pumping, new fencing and gates, site work, sedimentation and erosion control measures and all else required for a fully rehabilitated and operational Highway 1A pump station, in accordance with the Construction Drawings and Contract Specifications. Korea Street, No. 17 Pump Station: Replacement of existing pumps, motors, rails, piping, controls and panels, valves, belts, shives, within the existing Korea Street Pump Station, including new pressure transducer w/back up floats, clean existing wet-well and install a new wet-well coating system, provide and install new valve vault, new meter vault with flow meter, new access hatches w/fall-thru protection devices, new pump hoist and base, new emergency pump-around connection, reconnection to relocated standby generator including new automatic transfer switch, new generator concrete pad, new stainless-steel hood to cover electrical panels, provide and install all associated conduit, wiring, SCADA system, testing and start-up, bypass pumping, new fending and gates, site work, sedimentation and erosion control measures and all else required for a fully rehabilitated and operational Korea Street pump station, in accordance with the Construction Drawings and Contract Specifications. |
||||||||||||||||||
Details | Lift and Pump Stations, Renovation.
|
||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |