Similar Projects
Convention Center Expansion Phase 1
Addition
Conception
$78,000,000 est. value
Austin, TX 78701

A/E Services For The Risk Management Center Which Includes Projects Within The United States And Its Territories For Dam And Levee Safety And Other Work As Assigned To Usace
Design
$15,000,000 est. value

A/E Services For The Risk Management Center Which Includes Projects Within The United States And Its Territories For Dam And Levee Safety And Other Work As Assigned To Usace
Design
$15,000,000 est. value

National Architecture/Engineering/Interiors (IDIQ) Contract
Bidding
Less than $25,000,000 est. value

National Architecture/Engineering/Interiors (IDIQ) Contract
Bidding
Less than $25,000,000 est. value

C--Commissioning Authority (CXA) Services for the EPA
Post-Bid
$25,000 to $100,000,000 est. value

C--Commissioning Authority (CXA) Services for the EPA
Post-Bid
$25,000 to $100,000,000 est. value

USCG Ocean Architect/Engineering IDIQ MATOC
Results
$3,500 to $2,500,000 est. value

USCG Ocean Architect/Engineering IDIQ MATOC
Results
$3,500 to $2,500,000 est. value

Professional A/E Services for Space Planning and Interior Renovation
Construction
Less than $10,000,000 est. value
Austin, TX 78701

Professional A/E Services for Space Planning and Interior Renovation
Construction
Less than $10,000,000 est. value
Austin, TX 78701

A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

Fema Mitigation Plan Development
New Construction
Bidding
Austin, TX

Request for Information AE Next Pool 2 Architect-Engineering Services for Design and Construction Support for the Air Force Construction Program
Post-Bid

Operations and Maintenance Engineering Enhancement
Results
Less than $990,000,000 est. value

Last Updated 10/11/2021 06:20 PM
Project Title

MEP DM at Multiple State Building

Physical Address View project details and contacts
City, State (County) Austin, TX 78701   (Travis County)
Category(s) Professional Services
Sub-Category(s) Architectural, Engineering
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $9,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

HUB Goal 23.7%. Qualifications (RFQ) for professional HVAC Testing, Adjusting and Balancing (TAB) services at multiple state buildings in Austin, Texas including, but not limited to the following buildings for the respective projects: Project #20-004-5051 Insurance Building, (INS), 1100 San Jacinto Blvd; Price Daniel Building, (PDB), 209 West 14th St; Tom C Clark Building, (TCC), 204 West 14th St; Supreme Court Building, (SCB), 201 West 14th St; and Sam Houston Building, (SHB), 201 East 14th St. Approximate cost of construction for the aforementioned list of projects is estimated to be nine million dollars ($9,000,000). Project #20-011-5155: ARC - Lorenzo de Zavala Archives & Library 1200 Brazos Street CSB – Central Services Building 1711 San Jacinto Blvd INS – Insurance Building 1100 San Jacinto Blvd INX – Insurance Annex 221 E 11th Street JER – James E. Rudder Building 1019 Brazos Street JHR – John H Reagan Building 105 West 15th Street PDB – Price Daniel Building 209 West 14th Street REJ – Robert E Johnson Building 1501 N Congress Ave SCB – Supreme Court Building 201 W 14th Street SFA – Stephen F Austin Building 1700 N Congress Ave SHB – Sam Houston Building 201 East 14th Street TJR – Thomas Jefferson Rusk Building 200 E 10th Street WBT – William B Travis Building 1701 N Congress Ave WPC – William P Clements Building 300 West 15th Street. Approximate cost of construction for the aforementioned list of projects is estimated to be fifteen million dollars ($ 15,000,000.00). The professional HVAC Testing, Adjusting and Balancing (TAB) Scope of Service includes, but is not limited to, pre-auditing, testing and reporting, construction phase auditing, testing and reporting and includes final completion auditing, testing and reporting as required to verify, support and complete the DM work items. The Project construction scope of work includes, but is not limited to, renovation/replacement of air handling units, outside air handling units, air distribution systems and controls, and other necessary incidental scopes of work related to or made necessary by the execution of the aforementioned building deficiencies. Most of this work will need to occur during off hours of buildings and will have to be coordinated with the Property Manager and AE Team. Ability to provide adequate manpower to complete the services in allowable timeframes outside of operations is required.

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents