Similar Projects
Last Updated | 08/27/2020 04:44 PM |
Project Title | Amherst to Lockport Trail, Retaining Wall |
Physical Address | View project details and contacts |
City, State (County) | Pendleton, NY (Niagara County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | a. Install temporary erosion and sediment control devices prior to disturbing any areas b. Clear Canal embankment slope as necessary c. Remove and save existing stair railings d. Remove existing trail fence as necessary for wall construction e. Construct 225-ft long soldier pile and lagging wall along existing trail f. Restore 10-ft wide asphalt paved trail g. Install new trail fence h. Construct stairs for boat dock access and reset railings i. Remove and reset roadside guiderail j. Remove erosion and sediment control devices and restore all disturbed surfaces K. Install new trailhead parking signs l. Work zone traffic control m. Coordination with Niagara County Department of Public Works and Verizon |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |