Similar Projects
Mirror Lake Drive Sidewalk, Drainage & Pavement Improvements
Post-Bid
Less than $1,600,000 est. value
Lake Placid, NY 12946

Bulwagga Bay Campground Shoreline Assessment and Remediation Plan
Post-Bid
Port Henry, NY 12974

Honey Hill Road Outfall Channel Restoration
Results
Fort Plain, NY

Zukowski Drive Drainage Improvements Phase 1
Results
Less than $300,000 est. value
Garnerville, NY

West Street Drainage Outlet Remediation
Post-Bid
Harrison, NY 10528

Gooseberry Creek Revitalization Strategy – Creek Walk Park
Results
Less than $300,000 est. value
Tannersville, NY

Corrugated Metal Pipe Arches
Post-Bid
Fort Edward, NY 12828

Monkey Run Road Culvert Replacement
Results
Port Crane, NY

Culvert and Underdrain Pipe and Tubing W/ Arches Bands and Accessories
Term Contract
Post-Bid

Mirror Lake Drive Sidewalk, Drainage and Pavement Improvements
Results
Less than $1,100,000 est. value
Lake Placid, NY

Reconstruction of the Newark Street Drainage Culvert
Term Contract
Post-Bid
Lindenhurst, NY 11757

Replacement of Hannibal Street over Meadow Brook
Term Contract
Results
Fulton, NY 13069

Culvert Replacement Project CR23 (Brook Road) Over Slade Creek, Saratoga Springs
Post-Bid
Ballston Spa, NY 12020

Richbell Road Drainage Improvements at Ridgeway to Ethelridge Road
Results
White Plains, NY

Corrugated Metal Pipe Arches and Aluminized Pipe Arches
Post-Bid
Owego, NY 13827

Last Updated 08/27/2020 04:44 PM
Project Title

Amherst to Lockport Trail, Retaining Wall

Physical Address View project details and contacts
City, State (County) Pendleton, NY   (Niagara County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

a. Install temporary erosion and sediment control devices prior to disturbing any areas b. Clear Canal embankment slope as necessary c. Remove and save existing stair railings d. Remove existing trail fence as necessary for wall construction e. Construct 225-ft long soldier pile and lagging wall along existing trail f. Restore 10-ft wide asphalt paved trail g. Install new trail fence h. Construct stairs for boat dock access and reset railings i. Remove and reset roadside guiderail j. Remove erosion and sediment control devices and restore all disturbed surfaces K. Install new trailhead parking signs l. Work zone traffic control m. Coordination with Niagara County Department of Public Works and Verizon

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents