Similar Projects
Polk-Quincy - 701048.0 - City of Topeka
Infrastructure
Conception
$7,000,000 est. value
Topeka, KS

South Kansas Avenue(4th to 6th Avenue) - 841095 - City of Topeka
Alteration
Conception
$892,045 est. value
Topeka, KS 66630

New Middle School
New Construction - 146,000 SF
Design
$46,500,000 est. value
Topeka, KS

New Washburn Rural Middle School - 2022 Bond - Auburn Washburn Public Schools
New Construction, Infrastructure - 138,000 SF
Design
$48,647,000 CJ est. value
Mission, KS 66614

Pedestrian and Bicycle Paths
Infrastructure
Bidding
$700,000 CJ est. value
Topeka, KS 66611

Pedestrian and Bicycle Paths
Infrastructure
Bidding
$700,000 CJ est. value
Topeka, KS 66611

South Topeka Blvd BNSF Rail Crossing Removal & Pavement Replacement
Infrastructure
Post-Bid
Topeka, KS

Topeka Regional Business Center - Bldg. 612 Drainage Improvements
Infrastructure
Post-Bid
$100,000 CJ est. value
Topeka, KS 66612

City Street Repair
Infrastructure
Results
Topeka, KS

Arrowhead Heights Subdivision Street Repair SW 30th Street and SW Hillcrest Road
Infrastructure
Results
Topeka, KS 66630

Replacing the Bridge on SW 61st Street Over Six-Mile Creek
Demolition, New Construction, Infrastructure
Construction
$863,802 CJ est. value
Topeka, KS 66610

Replacing the Bridge on SW 61st Street Over Six-Mile Creek
Demolition, New Construction, Infrastructure
Construction
$863,802 CJ est. value
Topeka, KS 66610

Hill's Pet Nutrition Expansion / Project Prince
New Construction, Infrastructure
Pending Verification
$31,400,000 CJ est. value
Topeka, KS 66617

North Topeka Storage
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Topeka, KS 66608

South Topeka Boulevard from 15th to 21st - 701045 - City of Topeka
Infrastructure
Conception
$4,700,000 est. value
Topeka, KS 66630

Last Updated 05/12/2023 03:11 PM
Project Title

RFQ Design-Build - Oakland Aquatic Facility

Physical Address View project details and contacts
City, State (County) Topeka, KS 66616   (Shawnee County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Paving/Reconstruction, Site Development
Contracting Method Design-Build Firm to Subcontract, Competitive Bids
Project Status Bidding, Construction start expected January 2024 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $2,859,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Shawnee County is soliciting sealed proposals for PHASE II of the Design/Build bid # 010-23 for the design and construction of a new aquatic facility at Oakland Park, 801 NE Poplar for a fixed fee (the "Project"), per the following minimum specifications. The Shortlisted firms for this Design/Build are: 1. MCP Build consisting of Latimer Sommers & Associates & SBB Engineering 2. Carrothers Construction Co LLC with Water's Edge Aquatic Design 3. Professional Engineering Consultants PA with Lamp Rynearson, Dondlinger Construction & ATHCO PHASE II: PREQUALIFIED FIRMS SELECTED IN PHASE I ONLY 2.1 In accordance with K.S.A. 19-216f, Prequalified firms selected in Phase I shall be asked to submit a more in depth response on or before May 12, 2023 at 2:00 p.m. (CST). That response must include the following: A. Company overview: a. Philosophy Statement: Provide a statement of your firm's approach to Design- Build work and how it relates to schedule, cost control and QA/QC of your product. Describe how your corporate philosophy aligns with the County's mission statement and goals. b. Community involvement: Provide a brief description of your company history involving itself in the local communities that you are working within. Provide an overview plan on how your company will align and involve itself with our community. c. Experience in managing a construction project under the current laws of the State of Kansas. d. Experience in the following areas: i. Establishing multiple Rough Order of Magnitude Estimates. ii. Accuracy of estimates. iii. Ability to work with design team to provide accurate and meaningful direction for cost savings measures without impugning the integrity of design. B. Company Experience and references, relative to the Project: a. Furnish project information of no more than 5 Projects completed by your company that are representational projects similar in scale, complexity, schedule or type to those project types listed in the project overview portion of this proposal. Include the following: i. Project Name ii. Project Description (Including completion date.) iii. Project Type New/Remodel/Addition iv. Square Footage v. Original Construction Budget vi. Final Construction Budget vii. Cost per Square Foot viii. Project Duration ix. Architect (Contact Information to be included) x. Owner (Contact Information to be included) xi. Major obstacles that your company had to overcome for a successful completion of the project. C. Project Leadership Team: Provide a resume and organization chart for your project team for those individuals who will be assigned to the project. Their roles and responsibilities for the overall leadership of this project, for the duration of this project. For each individual furnish the following: a. Name b. Role and Responsibilities c. Experience: List the Last 5 projects that each individual has worked on, including owner contact information. d. Provide confirmation that assigned personnel will be available beginning immediately and throughout the duration of the project. D. Overview of preconstruction services. E. Overview of construction planning. F. Contractor's experience utilizing software for construction scheduling and for trade coordination. G. Proposed safety plan. H. Contractor's quality control program for pre-construction and construction phase. I. Special qualifications; unique or extraordinary skills that your team brings to this specific project. J. Experience with continuous operation requirements of the owner. K. Fees, including fees for preconstruction services, design services, fees for general conditions, fees for overhead and profit and fees for self-performed work, if any. L. Project delivery date.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents