Similar Projects
St. Croix Shores Boathouse - Stairs
Design
$500,000 to $1,000,000 est. value
Saint Croix Falls, WI 54024

126' Aluminum Truss Dock
Post-Bid
Scandinavia, WI 54977

Seasonal Removal and Installation of Dock
Post-Bid
De Soto, WI 54624

Boat Launch Repair
Results
Less than $360,000 est. value
Madison, WI 53703

Cotton Mill Park Fishing Platforms and Kayak Launch
Addition
Results
Beaver Dam, WI 53916

Pewaukee Lake Boat Launch Reconstruction
Post-Bid
Pewaukee, WI 53072

Courtesy Dock and Ramp
Results
Prescott, WI 54021

Fountain City Service Base Phase II Design Build
Post-Bid
Fountain City, WI

Instrumentation for Prestressing Miter Gate Diagonals - Lock & Dam 4
Results
Alma, WI 54610

Saint Croix Shores Boathouse - Stairs Project
Post-Bid
$500,000 to $1,000,000 est. value
Saint Croix Falls, WI 54024

Pine Lake Boat Launch Access Improvements
Results
Chenequa, WI

Hubbard Park Canoe and Kayak Launch
Infrastructure
Post-Bid
Shorewood, WI 53211

Pier 1 Water and Decking
Results
Washburn, WI 54891

Deck Replacements - Single Family Homes - USCG Housing Sturgeon Bay, Wisconsin
Term Contract
Post-Bid
Sturgeon Bay, WI 54235

Columbus - Watertown, Beaver Dam River
Results
WI

Last Updated 09/21/2021 03:18 PM
Project Title

FY21 Dock Repair - Apostle Islands National Lakeshore

Physical Address View project details and contacts
City, State (County) Bayfield, WI   (Bayfield County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work will consist of providing all labor, materials, tools and other equipment necessary to repair the current dock that was damaged by storm conditions. The repair will include encapsulating the perimeter of the existing dock with sheet piling, demolishing the existing concrete cap and leaving in place as fill, filling encapsulated dock with large rock fill, pouring a concrete cap, and installing cleats for mooring vessels.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents