Similar Projects
Guardian Self Storage
New Construction - 119,300 SF
Conception
$8,000,000 to $10,000,000 est. value
Fort Collins, CO 80525

Auto Trends
Addition - 4,750 SF
Conception
Fort Collins, CO 80524

Y--Flat Iron Warehouse and Office Construction DB
New Construction, Demolition - 15,000 SF
Design
$1,000,000 to $5,000,000 est. value
Loveland, CO

Centerra Industrial #7
New Construction - 122,807 SF
Post-Bid
$10,000,000 CJ est. value
Loveland, CO 80538

Estes Park 5-Bay VSF and Sand Shed
Post-Bid
$2,000,000 est. value
Estes Park, CO 80517

CLRD Fort Collins Admin Storage Building
New Construction
Results
$25,000 to $50,000 est. value
Fort Collins, CO 80524

Warehouse 5 Interior Renovation
Renovation
Results
$60,000 to $80,000 est. value
Fort Collins, CO 80524

Noco RV Rentals
New Construction
Pending Verification
$2,000,000 est. value
Fort Collins, CO 80524

Centerra Industrial Heavy Logistics Centers
New Construction - 3,951,408 SF
Pending Verification
$10,000,000 CJ est. value
Loveland, CO

Denrose Court Industrial/Office/R&D Facility
Renovation - 32,870 SF
Conception
Fort Collins, CO 80524

Foothills Hay Storage Quonset
New Construction
Post-Bid
Less than $150,000 est. value
CO

New Salt Shed
Results
Less than $225,000 est. value
Fort Collins, CO 80523

Craft Distillery
New Construction - 3,000 SF
Pending Verification
Fort Collins, CO 80521

Gordo Roofing Company Headquarters
New Construction - 22,500 SF
Conception
Fort Collins, CO 80525

LifeSpace Loveland - Buildings A, B & C
New Construction - 210,000 SF
Post-Bid
Loveland, CO 80538

Last Updated 07/27/2021 06:32 PM
Project Title

Water Treatment Plant Storage Building

Physical Address View project details and contacts
City, State (County) Loveland, CO   (Larimer County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a 52-foot by 96-foot, wood-frame Storage Building at the Water Treatment Plant (WTP).

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents