Similar Projects
Last Updated | 10/11/2023 12:19 PM |
Project Title | QSP 10-Door AMAG System Addition |
Physical Address | View project details and contacts |
City, State (County) | Holyoke, MA 01040 (Hampden County) |
Category(s) | Single Trades |
Sub-Category(s) | Windows/Doors |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected November 2023 |
Bids Due | View project details and contacts |
Estimated Value | $39,505 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Holyoke Housing Authority (HHA) is seeking price quotes for the project entitled 10-Door AMAG System Addition. Quotes will be received for furnishing all labor, materials, tools and equipment necessary to construct, equip, and finish the above project, in accordance with all applicable city and state codes. The contract will include removal of old door hardware and install new AMAG key fob access control to the existing system at the administrative offices in Holyoke, Massachusetts. Offices will remain occupied during replacement; the Contractor shall coordinate work with Holyoke Housing Authority to ensure proper ingress/egress is maintained for employees for duration of work. The Contractor shall be responsible for its work and every part thereof, and for all materials, tools, equipment, appliances, and property of any and all description used in the connection therewith. The Contractor assumes all risk of direct and indirect damage or injury to the property or persons used or employed on or in connection with the work contracted for, and of all damage or injury to any person or property wherever located, resulting from any action, omission, commission or operation under the contract. The Contractor shall be responsible for all associated permit fees. The Contractor shall, during the continuance of all work under the contract provide the following: a. Maintain statutory workers compensation insurance. b. Maintain commercial general liability insurance. c. Maintain owned, non-owned, and hired Automobile Liability insurance. d. Verification of (10) hours of OSHA training for all on-site and supervisory workers. The Contractor will provide an original, signed certificate of insurance within (10) days of award. Bond Requirements: 50% Payment Bond. Quotes are subject to M.G.L. c.149 sec.44A-J and prevailing wage rates as required by M.G.L. c.l49 26 to 27H inclusive. Contractor will provide certified weekly payroll records showing compliance with attached Davis-Bacon wage rate sheet. Attention is directed to the attached Conditions to Quote, HUD Table 5.1 Plus HUD 5370EZ, Special Conditions, Federal Prevailing Wage Rates. All technical questions related to this project to Brian Burbank, Chief Information Officer, at bburbank@holyokehousing.org, no later than 2:00 PM on September 28, 2023. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |