Similar Projects
Main Street- Center Street to 350 North - Nsl
Infrastructure
Bidding
UT

Weber State Davis Campus Access Road
Post-Bid
Layton, UT 84041

Construction of the 2020 Road Improvement Project
Post-Bid
Syracuse, UT 84075

Construction of the 2020 Chip Seal
Term Contract
Results
Less than $440,000 est. value
Kaysville, UT 84037

800 North - 2000 West to 3000 West Project
Results
Clinton, UT 84015

Antelope Animal Hospital Parking Expansion
New Construction, Alteration
Pending Verification
Syracuse, UT 84075

800 North Roadway Improvements 450 West to 50 West
Post-Bid
$1,736,000 est. value
Clearfield, Sunset, UT

Construction of the 800 West Improvement Project
Results
West Bountiful, UT 84087

2020 Sidewalk Trip Hazard Maintenance Program
Term Contract
Post-Bid
Less than $80,000 est. value
Bountiful, UT

Construction of the 2020 Seal Coat
Results
Less than $200,000 est. value
Kaysville, UT 84037

2020 100 North Reconstruction
Post-Bid
$419,700 est. value
Bountiful, UT 84010

SR-108; SR-126 to 1000 West
Results
$3,000,000 to $4,000,000 est. value
UT

Eagleridge Drive Street Overlay Roundabout to Parkview Drive
Post-Bid
North Salt Lake, UT 84054

2020 Street Maintenance Projects
Results
$111,000 est. value
Fruit Heights, UT 84037

Sunset Drive Curb, Gutter and Sidewalk Phase 2
Post-Bid
Kaysville, UT 84037

Last Updated 07/19/2021 05:03 PM
Project Title

Park Lane and 326 West Sidewalk - Farmington Pedestrian/Bike Facility

Physical Address View project details and contacts
City, State (County) UT   (Davis County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The principal items of work are as follows (for all items of work see attachment Contract Time Mobilization 1 015017010 Mobilization 1 Lump 2 015547005 Traffic Control 1 Lump 3 020567005 Borrow (Plan Quantity) 51 cu yd 4 022217050 Remove Tree 3 Each 5 022217080 Remove Fence 16 ft 6 022217125 Remove Concrete Curb and Gutter 18 ft 7 022217165 Remove Asphalt Pavement 35 sq yd 8 023167020 Roadway Excavation (Plan Quantity) 26 cu yd 9 02771705P Perpendicular/Parallel Pedestrian Access Ramp 1 Each 10 027767010 Concrete Sidewalk 590 sq ft 11 027767025 Concrete Curb and Gutter Type B1 107 ft 12 00221700 Contract Time Time Range: 15 - 35 Cal d Concrete Sidewalk

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents