Similar Projects
Last Updated | 11/21/2022 11:32 PM |
Project Title | Village of Russells Point Street and Sidewalk Improvements Project |
Physical Address | View project details and contacts |
City, State (County) | Bellefontaine, OH 43311 (Logan County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected December 2022 |
Bids Due | View project details and contacts |
Estimated Value | $389,945 [brand] Estimate |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project consists of the construction of new pavement oakcrest court. this will consist of the removal of existing concrete pavement and the replacement with full depth asphalt pavement. new curb and gutter will be installed and drive approaches will be replaced as needed. minor storm water improvements are included in this project. this project also consists of the construction and replacement of sidewalk on the east side of state route 708. Each bid must be accompanied by either a bid bond in an amount of 100% of the bid amount with a surety satisfactory to the aforesaid Logan County Commissioners or by certified check, bid bond, cashiers check, or letter of credit upon a solvent bank in the amount of not less than 10% of the bid amount in favor of the aforesaid Logan County Commissioners. Bid Bonds shall be accompanied by Proof of Authority of the official or agent signing the bond. Bids shall be sealed and marked as Bid for: Russells Point Street & Sidewalk Improvements Project and mailed or delivered . Attention of bidders is called to all of the requirements contained in this bid packet, particularly to the Federal Labor Standards Provisions and Davis-Bacon Wages, various insurance requirements, various equal opportunity provisions. No bidder may withdraw his bid within sixty (60) days after the actual date of the opening thereof. Logan County reserve the right to waive any informalities or to reject any or all bids. The Contract Time to fully complete the project shall be by June 30, 2023 The Engineers cost estimate with contingencies is ($437,900) Dollars. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |