Similar Projects
Sherrills Ford Road 1.0 MG Storage Tank
Infrastructure
Conception
$3,000,000 est. value
Sherrills Ford, NC 28673

111 Main Apartment Building
New Construction, Infrastructure - 5,000 SF
Design
$41,000,000 CJ est. value
Hickory, NC 28658

Blackburn Resource and Recovery Facility - Landfill Access Road Repairs
Infrastructure
Bidding
$200,000 CJ est. value
Newton, NC 28658

Blackburn Resource and Recovery Facility Landfill Fence Relocation Project
Infrastructure
Bidding
$100,000 CJ est. value
Newton, NC 28658

Snow Creek Pump Station Relocation and Flood Hardening - City of Hickory
Renovation, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Hickory, NC 28658

RFQ Design - Education Center Engineering and Design
New Construction, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Hickory, NC 28658

CVCC Stream Bank Repair
Results
Hickory, NC 28602

Trenchless Steel Pipe Installation (Bore and Jack)
Infrastructure
Results

Maiden Elementary School for Catawba County Schools
Demolition, New Construction, Infrastructure - 95,007 SF
Construction
$29,000,000 CJ est. value
Maiden, NC 28650

Additions and Renovations at Newton Conover High School
Addition, Renovation, Infrastructure
Pending Verification
$20,800,000 CJ est. value
Newton, NC 28658

Merchants Distributors Expansion
Addition, Demolition, Infrastructure - 250,000 SF
Pending Verification
$35,000,000 CJ est. value
Hickory, NC 28601

Trivium East Roadway Improvements - City of Hickory
Infrastructure
Post-Bid
$3,213,000 CJ est. value
Hickory, NC 28658

Corrugated Aluminized Pipe
Infrastructure
Results
Newton, NC 28658

Additions and Renovations at Newton Conover High School
Addition, Renovation, Infrastructure
Pending Verification
$20,800,000 CJ est. value
Newton, NC 28658

Punch Loop Road Relocation
Infrastructure
Post-Bid
$2,000,000 est. value
Conover, NC 28613

Last Updated 02/17/2023 11:57 AM
Project Title

Boston Road Stormwater Culvert Replacement

Physical Address View project details and contacts
City, State (County) Newton, NC 28658   (Catawba County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Sealed proposals for Boston Road Stormwater Culvert Replacement services may be submitted as outlined below. The successful bidder shall provide culvert replacement services for the City of Newton. The stormwater culvert that is to be replaced is located at 1391 Boston Road, Newton NC 28658. The City reserves the right to add, delete or modify the job specifications pending discoveries during work and/or available funds and current needs. The successful Contractor shall furnish and pay all costs including sales tax, applicable federal, state or city taxes and/or fees. The Contractor shall furnish all materials, supervision, labor, sub-trade costs, tools, barriers, equipment, clean-up, debris removal, rentals, porta-potty, transportation, and other items that may be needed to fulfill the work as defined in this request. The City reserves the right to waive minor irregularities or minor errors in the proposal, if it appears to the City that such irregularities or errors were made through inadvertence. Any such irregularities or errors so waived must be corrected on the proposal prior to acceptance by the City. The City also reserves the right to reject any and all proposals Interested parties shall contact Assistant Public Works and Utilities Director, Dennis Falder before 10:00a.m. February 8, 2023 at (828-695-4298) or by email at dfalder@newtonn.gov. Questions regarding the bid documents may be addressed to the Procurement Officer Mrs. Lynn Triplett, by e-mail ltriplett@newtonnc.gov or phone (828-695-4328). It shall be the responsibility of the sender to confirm receipt by the City. The City of Newton's current goal for minority participation for public building construction is five percent (5%). The intent of these guidelines is to ensure that the City of Newton, as awarding authority for construction projects, and the contractors and subcontractors performing the construction contracts awarded, shall cooperate and in good faith do all things, legal, proper and reasonable to achieve the statutory goal of five percent (5%) for participation by minority businesses in each construction project as mandated by GS 143-128.2. Nothing in these guidelines shall be construed to require contractors or awarding authorities to award contracts or subcontracts to or to make purchases of materials or equipment from minority-business contractors or minority-business subcontractors who do not submit the lowest responsible responsive bid or bids. For M/WBE questions, call: 828-695-4328. Only approved contractors from the NC Statewide Uniform Certification list may be used for this contract. Bidders are reminded that the minimum M/WBE Program documentation is due at the time of the bid opening. When work is added to the contract through change orders, or by other written means, the contractor is to pursue portioning work to the respective M/WBE contractors accordingly. Contractor Shall keep a (12) twelve-foot lane open at all times, as this is the ONLY entrance and exit for the residents on the North side of the culvert that is to be replaced. Contractor shall be responsible for maintaining Traffic Control throughout the entire duration of the project. Remove (2) two trees on the exit side of the culvert. Remove, haul off, and install a new watertight (4) four feet by (4) four feet with a wall thickness minimum of 4 inches and minimum weight per lineal ft./lbs of 1160 by approximately (48) forty-eight linear feet of Traffic Rated Box Culvert (NO SPLIT BOXES). The select fill around the excavation site shall consist of CABC material. The cost for the select fill material shall be included in the lump sum line item for the box culvert installation price on the bid sheet. Install (2)two feet of compacted #57 washed stone wrapped in geotextile separation filter fabric for undercut below the new box culvert. Install winged concrete reinforced headwall at intake side of the box culvert. Install Class-1 Rip-Rap with Geotextile Filter Fabric for slope protection. Install Silt Fence (EROSION CONTROL). Remove and replace Asphalt Pavement; (6) six inches of CABC, (2) twoinch Min. Binder, (2) two-inch Min. Asphalt Surface Course (S9.5B). Line Item # 3 Miscellaneous Items of the Bid Form will need to include the cost of whatever means and methods you plan to use to ensure that (1) one lane of traffic is available throughout the entire duration of the project. ALTERNATE Install winged concrete reinforced endwall at exit side of the box culvert. The completion time for this contract is 60 Sixty calendar days

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents