Similar Projects
US 101/Black Lake Blvd Bridge - Special Repair
Infrastructure, Renovation
Conception
$316,000 CJ est. value
Tenino, WA 98589

US 101/Black Lake Blvd Bridge - Special Repair
Infrastructure, Renovation
Conception
$316,000 CJ est. value
Tenino, WA 98589

SR 8/US 12 to US 101 - Paving
Infrastructure
Design
Less than $4,981,000 est. value
Olympia, WA

I-405, NE 85th Street Interchange and Inline BRT Station Project
Term Contract
Bidding
$210,000 est. value

Bus Stop Pad Construction and Improvements
Infrastructure
Bidding
$950,000 CJ est. value
Lacey, WA 98503

Parking Lot Preservation Phase Two
Alteration
Post-Bid
$846,000 to $951,000 est. value
Tumwater, WA 98501

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Stratford Lane Step to Gravity Conversion
Infrastructure, Alteration
Results
$220,878 est. value
Olympia, WA

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Chief Joseph Wildlife Area Road Stabilization Phase 2
Infrastructure
Post-Bid
Olympia, WA

SouthWest Mosman Avenue Phase Two
Infrastructure
Results
$1,150,000 to $1,270,000 est. value
Yelm, WA 98597

2022 Chip Seal Project
Infrastructure
Post-Bid
$2,600,000 to $3,100,000 est. value
Olympia, WA

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

Woodard Creek Retrofit Site 1 (South Bay Road and 26th Avenue Norteast)
Infrastructure
Post-Bid
$653,906 to $697,297 est. value
Olympia, WA 98508

US 101, Delphi Rd to I-5 Paving and Concrete Barrier
Infrastructure
Results
$1,250,000 to $1,500,000 est. value
WA

Last Updated 07/26/2022 12:08 PM
Project Title

2022 Karen Fraser Woodland Trail and Sunrise Park Trail Repairs

Physical Address View project details and contacts
City, State (County) Olympia, WA 98501   (Thurston County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of removing and replacing asphalt pavement and concrete sidewalk in designated repair areas, removing roots, root pruning and all restoration and other work in accordance with the Contract.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents