Similar Projects
Pedestrian Improvement Project: Installation of a Rapid Rectangular Flashing Beacon for Hillcrest Blvd at Queen Street
Infrastructure
Bidding
$5,000,000 CJ est. value
Inglewood, CA 90301

Various Signalized Intersections Improvement Project - Bid
Infrastructure
Bidding
$1,100,000 CJ est. value
Commerce, CA 90040

Concrete Cutting Services
Term Contract
Post-Bid
zh, CA 93510

Downtown Visalia Streetlights and Paving Project
Infrastructure, Alteration
Post-Bid

Construction of Concrete Improvements in Residential Streets
Alteration
Results
Cerritos, CA

Place Minor Concrete and Highway Plants
Alteration
Results
$3,850,000 est. value
Los Angeles, CA 90081

City Parks Playground Replacements
Infrastructure
Bidding
$580,000 CJ est. value
Monterey Park, CA 91754

Annual Residential Street Rehabilitation Project (Phase 2B)
Term Contract
Post-Bid
Compton, CA 90221

Outdoor Gym Concrete
Alteration
Results
$100,000 est. value
Lancaster, CA 93536

Portland Cement Concrete Materials (As-Needed)
Term Contract
Post-Bid
$35,000 est. value
Palmdale, CA

Install Plants, Irrigation, and Prepare and Stain AC and Concrete
Alteration
Results
$830,000 est. value
City of Industry, CA 91714

RFQ Contractor - Belmont Beach and Aquatics Center
Demolition, New Construction, Infrastructure - 90,480 SF
Post-Bid
$70,000,000 CJ est. value
Long Beach, CA 90803

Prepare and Stain Concrete
Alteration
Results
$640,000 est. value
Los Angeles, CA

Asphalt Concrete Cement
Infrastructure
Post-Bid
Pasadena, CA

Individual Slab Replacement
Alteration
Results
$2,800,000 est. value
Long Beach, CA 90810

Last Updated 06/28/2023 02:36 AM
Project Title

2022-23 CDBG Sidewalk Improvement Project

Physical Address View project details and contacts
City, State (County) La Verne, CA 91750   (Los Angeles County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $65,600 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Sidewalk Repair and Replacement Project Pre-Bid Meeting - No Online Q&A - No Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Liquidated Damages - 500 Estimated Bid Value - 110,000 Start/Delivery Date - 7-24-2023 Project Duration - 35 Working Days Type of Award - Lump Sum DESCRIPTION OF WORK/SCOPE OF WORK: The work consists of sidewalk repairs, curb ramps, and other associated work necessary to complete the project as specified. COMPLETION OF WORK: The contract duration, including active construction and materials procurement, shall be thirty five (35) working days. Ordering of materials shall proceed within 10 days after the date set forth in the Notice to Proceed. Construction activities shall commence on July 24th, 2023 and shall be completed within the allowable working days. Contractor shall provide the City with a tentative construction start date and the City reserves the right to modify the construction start date at their discretion.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents