Similar Projects
Almond Creek Interceptor Creek Crossing Replacement and Creek Stabilization
Bidding
Less than $3,500,000 est. value
Richmond, VA

Precast Concrete Box Culvert
Infrastructure
Bidding
VA

WAWA #8640 Stormwater Repairs
Renovation
Post-Bid
Sterling, VA 20166

Z--COLO 253093 York River Shoreline Stabilization 2B
Post-Bid
$10,000,000 est. value
Yorktown, VA

NASA Wallops Beach Renourishment (Backpassing)
Results
$10,000,000 to $25,000,000 est. value
Wallops Island, VA 23303

Piney Branch Stream Restoration - Construction
Results
Less than $1,600,000 est. value
Vienna, VA 22160

Box Culvert - Rte 649
Infrastructure
Bidding
VA

Water Management Infrastructure
Post-Bid
Suffolk, VA 23434

Lynnhaven River Basin Ecosystem Restoration, Phase 1 Reef Habitat
Results
$1,000,000 to $5,000,000 est. value
Virginia Beach, VA

St. Claire Lane Sidewalk and Drainage Improvements
Infrastructure
Bidding
Richmond, VA 23223

Concrete Pipe
Post-Bid
Lebanon, VA 24266

Design-Bid-Build, P653 Dry Dock Flood Protection Improvements
Results
$25,000,000 to $100,000,000 est. value
Portsmouth, VA

Dry Run Bank Stabilization Project
Infrastructure
Post-Bid
Covington, VA

On-Call Pipe Rehabilitation and Repair
Results
Less than $701,000 est. value

Plastic Culvert Pipe
Infrastructure
Post-Bid
Rockville, VA 23146

Last Updated 01/25/2022 11:15 AM
Project Title

Culvert Replacement on A Street

Physical Address View project details and contacts
City, State (County) Waynesboro, VA 22980   (Waynesboro City County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Install erosion and sediment control measures and set up traffic control. 2. Remove existing asphalt from culvert crossing and the existing six (6) pipe culvert system. 3. Install pump around to divert water from stream flow. 4. Relocate 6” D.I. water line in accordance with approved plan. 5. Install pre-cast culvert system and all appurtenances. 6. Resurface the roadway in accordance with the approved plan and install guardrail. 7. Stabilize all disturbed areas.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents