Similar Projects
Beach Pedestrian Path - Ashley Avenue
Infrastructure
Bidding
Folly Beach, SC

Stoney Field Improvements Phase 3
Infrastructure
Bidding
Charleston, SC 29403

Ben Sawyer Intracoastal Waterway Water Main Crossing
Post-Bid
Charleston, SC 29401

Materials Contract
Term Contract
Post-Bid
Mount Pleasant, SC 29464

Beach Club Villas Water Main Replacement
Results
Isle of Palms, SC 29451

Dunoon Drive Drainage Improvement Project
Results
Less than $64,640 est. value
Charleston, SC 29401

Road Work - Maxwell Street Sidewalk Improvements TST
Infrastructure
Bidding
Charleston, SC

Rivers Avenue at TTC 30-Inch Transmission Main Offset
Post-Bid
Charleston, SC 29402

Zucker GEC Parking Lot - Resurface
Results
$103,318 est. value
North Charleston, SC 29634

On-Call Sidewalk Repair-District 6
Term Contract, Infrastructure
Bidding

Hollywood/Ravenel Water Main Extension Phase 3
Post-Bid
Charleston, SC 29401

St. Julian Devine Community Center Site Improvements
Results
Less than $399,557 est. value
Charleston, SC 29403

Phase 3 Internal Drainage Improvements
Post-Bid
Isle of Palms, SC 29451

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

CDBG Sidewalk Improvements
Post-Bid
North Charleston, SC 29419

Last Updated 10/18/2021 01:45 PM
Project Title

Road Work - E. Ashley Avenue, Folly Beach Drainage Improvements, Waterline Replacement and Sidewalk Replacement CTC

Physical Address View project details and contacts
City, State (County) Charleston, SC   (Charleston County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project work shall consist of the installation of approximately 1,850 feet of storm drainage on 2nd Street and on East Ashley Ave (between 2nd Street and 3rd Street). The work shall also include two City of Folly Beach projects on 2nd Street, the first is for a waterline replacement project for approximately 320 feet of 4” PVC pipe and approximately 109 feet of (4” & 6”) ductile iron pipe and the second is for a sidewalk project for the installation of approximately 165 feet of a variable width (9.8’-4.6’) concrete sidewalk and approximately 180 feet of a 6 foot wide pervious asphalt sidewalk. In addition, the work shall include, but is not limited to, installing vehicle parking spaces on 2nd Street, asphalt driveway aprons, milling and resurfacing of asphalt pavement, erosion and sediment control, and traffic control. The project will be constructed utilizing the items listed on the bid forms for each project (E. Ashley Drainage Project, Waterline Replacement Project, and the Sidewalk Project bid forms) in the solicitation.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents