Last Updated | 10/18/2021 01:45 PM |
Project Title | Road Work - E. Ashley Avenue, Folly Beach Drainage Improvements, Waterline Replacement and Sidewalk Replacement CTC |
Physical Address | View project details and contacts |
City, State (County) | Charleston, SC (Charleston County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project work shall consist of the installation of approximately 1,850 feet of storm drainage on 2nd Street and on East Ashley Ave (between 2nd Street and 3rd Street). The work shall also include two City of Folly Beach projects on 2nd Street, the first is for a waterline replacement project for approximately 320 feet of 4” PVC pipe and approximately 109 feet of (4” & 6”) ductile iron pipe and the second is for a sidewalk project for the installation of approximately 165 feet of a variable width (9.8’-4.6’) concrete sidewalk and approximately 180 feet of a 6 foot wide pervious asphalt sidewalk. In addition, the work shall include, but is not limited to, installing vehicle parking spaces on 2nd Street, asphalt driveway aprons, milling and resurfacing of asphalt pavement, erosion and sediment control, and traffic control. The project will be constructed utilizing the items listed on the bid forms for each project (E. Ashley Drainage Project, Waterline Replacement Project, and the Sidewalk Project bid forms) in the solicitation. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |