Last Updated | 08/08/2022 06:32 PM |
Project Title | Mesa Street and Texas Avenue Stormwater Main Replacement |
Physical Address | View project details and contacts |
City, State (County) | El Paso, TX 79901 (El Paso County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $466,529 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Works to be provided for this project shall be for furnishing all labor, materials, transportation, and services for the construction and installation as follows: The Project consists of the replacement of existing reinforced concrete pipe stormwater main that has failed along Mesa St. between Mills St. and Texas Ave. The work under this contract shall be for furnishing all labor, materials, transportation and services for the construction and installation of the following work: Installation of approximately 260 linear feet of 18-inch reinforced concrete pipe stormwater main, installation of approximately 50 linear feet of 12-inch reinforced concrete pipe; remove 2 existing inlets and installation of I inlet Type I with 2-grates and I inlet Type II with 5 grates; remove of 2 existing junction boxes, remove of 2 existing manholes, installation of 2 cast-in-place 4' x4' junction boxes; installation of I cast-in-place 3' x 1 O' junction box and removal of approximately 55 linear feet of 12-inch reinforced concrete pipe. Removal, disposal and replacement of approximately 795 square yards of reinforced concrete pavement, 45 linear feet of concrete curb/gutter/rolled curb, concrete hardscape; and miscellaneous striping and markings. These improvements will require trench safety system for pipeline; videotaping of project site before and after construction; and a Storm Water Pollution Prevention Plan. TXDOT will provide Traffic Control. The construction time for this project from Notice to Proceed to Final Completion will be 120 calendar days. Key Personnel required for this project are the Bidder's Project Manager, Project Superintendent and Foreman. The project description, as shown above, is only a general overview of this project. For additional information, submit your inquiry to the Purchasing / Contracts email address: Purchasing.Info@epwater.org. Estimate: $318,087.79 - $466,528.76 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |