Similar Projects
Roadway Resurfacing Milepost 0 to 122
Bidding

Repaving of Wastewater Treatment Plant Area and Access Road
Post-Bid
Lambertville, NJ

Roadway Improvement Project and Water Main Replacement Project
Post-Bid
Milford, NJ 08848

2018 Various Streets Paving
Results

Roadway Improvement Project for Highland Avenue and Elwood Avenue
Results
$480,917 est. value
Flemington, NJ 08822

Roadway Improvement Project for Case Boulevard
Post-Bid
Raritan Township, NJ 08822

Cokesbury Road Resurfacing and the 2019 Roadway Improvement Project
Results
$135,777 est. value
Lebanon, NJ

Resurfacing of Homestead Road
Post-Bid
Califon, NJ 07830

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Milford Road Improvement Project Sections III
Post-Bid
Frenchtown, NJ 08825

Main Street Improvements
Results
Califon, NJ 07830

Stanton Mountain Road Improvements Phase 2
Post-Bid
Lebanon, NJ 08833

Hunterdon County Routes 513 and 628
Results
$6,164,924 est. value
Flemington, Franklin, Glen Gardner, Lebanon, NJ 08822

Improvements to Sanford Road
Post-Bid
Sergeantsville, NJ 08557

Maintenance Roadway Contract C114, NJ 31 NB and SB
Results
$5,000,001 to $10,000,000 est. value
NJ

Reported 07/30/2020 12:00 AM
Project Title

Hilltop Drive and Moore Street Road Improvements

Physical Address View project details and contacts
City, State (County) Stockton, NJ 08559   (Hunterdon County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Hilltop Drive and Moore Street Road Improvements Hilltop Drive improvements include the repair of soft spots in the roadways, construction of granite block curbing, new asphalt driveway aprons, and full depth reclamation of the roadway. Moore Street improvements include installation of an 8"water main, construction of ADA ramps, excavation and reconstruction of the roadway and repaving the roadway with hot mix asphalt. Construction shall take place between August 5, 2019 and October 11, 2019.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents