Similar Projects
Submersible Pumps and Wastewater Lift Stations
New Construction
Bidding
Cocoa, FL 32922

Lift Station, Grease Trap and Septic Tank Pump and Maintenance
Term Contract
Results
Less than $300,000 est. value
Viera, FL 32940

Repair Lift Station Pumps Bldgs. 650 and 1497 & Replace Lift Station Bldg. 943, Patrick AFB, FL
Results
$1,000,000 to $5,000,000 est. value
Patrick AFB, FL 32925

Lift Station 93 Rehabilitation
Results
Less than $106,966 est. value
Palm Bay, FL 32909

Lift Station and Force Main C-01 Replacement
Results
$547,000 est. value
Merritt Island, FL 32953

Lift Station No. 11 Replacement Young Street
Results
Melbourne, FL 32901

Intermediate Pump Station Improvements
Results
$457,300 est. value
Cape Canaveral, FL 32920

Lift Station #3 Rehabilitation
Results
$340,000 est. value
Cape Canaveral, FL 32920

Marina Lift Station Improvements
Results
Less than $522,000 est. value
Titusville, FL 32796

Lift Station 43 Rehabilitation
Results
Palm Bay, FL 32907

Lift Stations J-03, J-04, and J-05 Rehabilitation
Results
Port Saint John, FL 32927

Lift Station S-21 Rehabilitation
Results
$60,216 est. value
Viera, FL 32940

Rehabilitation of Brevard County Lift Station M-17 and V-11
Results
$196,930 est. value
Merritt Island, FL 32952

Lift Station T-09 Rehabilitation
Results
Viera, FL 32940

Lift Station N-01 Replacement
Results
$544,090 est. value
Viera, FL 32940

Last Updated 07/24/2020 01:40 PM
Project Title

Hall Road Pump Station

Physical Address View project details and contacts
City, State (County) Merritt Island, FL 32953   (Brevard County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,722,320
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project, Hall Road Pump Station consists of the construction of a new stormwater pump station on East Hall Road in North Merritt Island. The work includes the construction of a prefabricated concrete building housing two electric/diesel engine driven hydraulic drives serving two submersible hydraulic pumps, construction of a sump including a new culvert crossing Hall Road, and related work including site work, site piping, fuel storage, electrical service, fencing, water main/force main/reclaimed main relocation and other work. The project also includes the replacement of an existing mosquito control sheet pile control weir system and earthwork improvements to an existing mosquito control impoundment basin.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents