Similar Projects
2021 Small Main Remove and Replace Project
Infrastructure
Bidding
Pueblo, CO

16 Potable Pipe Crossing of Fountain Creek
Post-Bid
Pueblo, CO

Z--Romo/239689, Moraine Park Campground and HQ Utilities-GAOA
Term Contract
Post-Bid
$10,000,000 est. value
Estes Park, CO 80517

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Annual Contract for Water Meters - 1 /2" and 2"
Term Contract
Results
Pueblo, CO 81002

Hydraulic Valve Operator 2021
Infrastructure
Post-Bid
CO

Annual Contract for Water Meters - 3/4" and 1"
Term Contract
Results
Pueblo, CO 81002

Leak Detection Condition Assessment 24" Water Main
Infrastructure
Post-Bid
Pueblo, CO

Annual Contract for Compound Water Meters
Term Contract
Results
$30,000 to $35,000 est. value
Pueblo, CO 81002

2020 Northside Service Line Potholing
Results
Pueblo, CO 81002

Annual Contract for Turbine Water Meters
Term Contract
Results
Less than $57,556 est. value
Pueblo, CO 81003

Resilient Seated Gate Valves 2020
Term Contract
Results
Pueblo, CO 81002

Tapping Sleeves 2020
Term Contract
Results
Pueblo, CO 81002

Fire Hydrants 2020
Term Contract
Results
Pueblo, CO 81002

Cast Iron Fittings 2020
Term Contract
Results
Pueblo, CO 81002

Last Updated 10/11/2021 12:18 PM
Project Title

Pueblo Water - City Wide Main Renewals 2021 Phase 2

Physical Address View project details and contacts
City, State (County) Pueblo, CO   (Pueblo County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $600,968
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project is to install approximately 3,300 lineal feet of six-inch through eight-inch diameter water mains and appurtenances for renewal on Salem Avenue, Oakshire Lane, Queens Avenue, Yorkshire Road, and Churchill Place. Pueblo Water will furnish all PVC pipe, valves, fire hydrants, appurtenant fittings, and service line materials. All bedding, backfill, and surface replacement materials shall be furnished by the Contractor.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents