Similar Projects
Zebra Mussel Mitigation, Fort Randall
Results
Pickstown, SD 57367

South Dakota Union Asbestos Abatement
Term Contract, Infrastructure
Results
$40,000 CJ est. value
Vermillion, SD 57069

Pipe Work, Erosion Control
Infrastructure
Results
$1,797,814 CJ est. value
Mc Intosh, SD 57641

Pre-Commercial Thinning FY2023
Term Contract
Post-Bid
Custer, SD 57730

Pipe Work, Erosion Control
Infrastructure
Results
$1,797,814 CJ est. value
Mc Intosh, SD 57641

Retaining Wall Replacement
Renovation
Post-Bid
$2,865,000 CJ est. value
Pierre, SD 57501

Hauling and Disposal of Residential Garbage
Term Contract
Post-Bid
Murdo, SD 57559

Asbestos Abatement at Minnehaha County Administration Building
Alteration
Post-Bid
Sioux Falls, SD 57104

Steven High School Fine Arts/2nd Floor - Asbestos Abatement
Alteration
Post-Bid
Rapid City, SD 57702

Brownfields Cleanup, Asbestos Abatement, Lead Based Paint Abatement and Removal/Disposal of Potential Hazardous Materials Red Log Building
Alteration
Results
$188,000 est. value
Rosebud, SD

Pipe Work, Erosion Control
Infrastructure
Results
$1,797,814 CJ est. value
Mc Intosh, SD 57641

Last Updated 12/09/2022 05:05 PM
Project Title

DPS Crooked Canyon Phase 2

Physical Address View project details and contacts
City, State (County) Black Hawk, SD 57718   (Meade County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this RFP is to solicit proposals from qualified contractors to perform hazardous fuels reduction treatment on approximately 33 acres of property located near Piedmont, SD, Section -30 Township 3N Range 7E. SDWF contracts may be entered into with more than one contractor as a result of this RFP Deadline for Submission of Written Inquiries 11/18/2022 The length of the contract will be for two years. SDWF reserves the right to reject any or all proposals, waive technicalities, and make award(s) as deemed to be in the best interest of the State of South Dakota.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents