Similar Projects
Grove XXIII
New Construction - 32,587 SF
Construction
$15,000,000 to $20,000,000 est. value
Hobe Sound, FL 33455

SLS Hotel and Condo
New Construction, Renovation - 12,000 SF
Construction
$69,887,000 est. value
Hallandale, FL 33009

Paradise Isle
New Construction, Renovation - 100,000 SF
Design
$600,000,000 to $1,000,000,000 est. value
North Fort Myers, FL

Boca Raton Resort & Country Club
Renovation
Design
$75,000,000 est. value
Boca Raton, FL 33432

Public Private Partnerships (P3) Golf and Entertainment Golden Gate Golf Course
Results
Naples, FL 34112

PopStroke Putting Course
New Construction
Pending Verification
Orlando, FL

Contract Labor Services for Golf Course
Term Contract
Results
Palm Beach Gardens, FL 33410

PGA of America West Palm Beach
New Construction, Renovation
Conception
$20,000,000 to $25,000,000 est. value
West Palm Beach, FL 33405

De La Vista Fairway Renovations
Renovation
Results
Less than $34,595 est. value
The Villages, FL 32162

Stillwater Golf Course
New Construction
Construction
Saint Johns, FL 32092

Silver Lake Golf Course Renovation
Renovation
Results
Less than $500,000 est. value
Lady Lake, FL 32159

Myakkahatchee Creek Greenway Disc Golf Course Development
Results
Less than $100,000 est. value
North Port, FL 34287

Turtle Run Aqua Tees
Post-Bid
Sebring, FL

University Park Country Club
Post-Bid
Bradenton, FL 34201

Hollywood Beach Golf Course and Clubhouse
Renovation
Conception
Hollywood, FL 33020

Last Updated 06/01/2020 01:46 PM
Project Title

Fernandina Beach Golf Club Driving Range Practice Facility Renovation

Physical Address View project details and contacts
City, State (County) Fernandina Beach, FL   (Nassau County)
Category(s) Entertainment/Recreation
Sub-Category(s) Golf Course
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Several improvements to the Fernandina Beach Golf Course are anticipated: the driving range, North Course greens (Holes No. 3 and No. 5), and the practice putting green area. Driving Range • Strip and dispose of (on-site) existing sod • Remove existing bulkhead at tee area and shape entire surface to one level • Sod with Certified 419 turf, total area estimated 25,000 sq. ft. • Laser grade with .5% fall, total area estimated 18,000 sq. ft. • Install new irrigation heads (ten) North Course Greens • Strip and dispose of (on-site) existing sod • Reshape green at Hole No. 3 (in accordance with prepared design) • Expand and shape green at Hole No. 5 (in accordance with prepared design) • Sod collars and disturbed areas with certified 419 turf • Install additional irrigation loop at Hole No. 5 • Reshape bunker at Hole No. 5 (in accordance with prepared design) • Final float surfaces Practice Putting Green Area • Preparation of putting green and surrounding area (removal of turf and existing irrigation, as needed) • Core 8” depth remove organics of new putting green area (dispose of on-site) • Shape sub-grade of area, including practice sand bunker, (in accordance with prepared design) • Install new irrigation loop (ten heads) • Provide and install 4” of USGA-grade sand to be mixed into native soil from on-site as rootzone material of the new putting green • Provide and install 6” of bunker sand • Till, compact, and final float entire area of putting green (estimated 7,000 sq. ft.) • Provide and install Certified 419 (estimated 5,500 sq. ft.) • Estimated 100 linear feet of new curb to redirect water from path around the practice putting green • Plant 40 Bushels per 1000 sq. ft. of ultra-dwarf sprigs, variety to be determined Owner

Details

Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Lockers, Flagpoles, Flags and Banners.
Division 22 - Plumbing, Facility Sanitary Sewerage, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Clearing and Grubbing, Earth Moving, Grading, Excavation and Fill.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting Irrigation, Planting Preparation, Turf and Grasses, Plants, Planting Accessories.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Utility Water Drains, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents