Similar Projects
Wengert Road Well Field Pump Replacement
Infrastructure
Post-Bid
$170,000 est. value
Blacklick, OH 43004

Banjo 200 Pumps
Infrastructure
Post-Bid
Columbus, OH 43223

Drilling (4) Monitoring Wells, Ohio, USA
Results
$25,000 to $100,000 est. value
Columbus, OH

Dow/Pawp--Moyno Stator
Renovation
Results
Columbus, OH

Orphan Well Abandonment - Phase I
Alteration
Post-Bid
$28,500,000 est. value

Raymond Memorial Golf Course Well Pump Replacement 2021
Results
Columbus, OH 43228

KSB Pump Maintenance and Service
Infrastructure
Post-Bid
Columbus, OH

Centrifugal Pump
Results
Less than $1,153 est. value
Columbus, OH

Water Champ Systems Maintenance and Repair Service
Infrastructure
Post-Bid
Columbus, OH

Sewage Pump with Mechanical Float
Results
Less than $1,100 est. value
Columbus, OH

JPWWTP - Myers Pump
Results
Columbus, OH 43223

DOW/PAWP--Watson Marlow Pump Upgrade
Results
Lockbourne, OH 43137

Private Water Service Plan
Infrastructure
Results
Groveport, OH 43125

JPWWTP - Condensate Pump
Infrastructure
Results
Columbus, OH

DOW/PAWP - Water Pump Suction Vault Repair
Infrastructure
Results
$13,100 est. value
Columbus, OH

Last Updated 05/10/2022 12:04 AM
Project Title

Reed Road Water Park Pre-Season Pump Service

Physical Address View project details and contacts
City, State (County) Upper Arlington, OH   (Franklin County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Servicing and repair of two pool pumps located at the Reed Road Water Park.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents