Similar Projects
Reported | 04/17/2021 12:00 AM |
Project Title | Champlain Valley Union High School Administration ERU |
Physical Address | View project details and contacts |
City, State (County) | Hinesburg, VT 05461 (Chittenden County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Installing an Energy Recovery Unit at Champlain Valley Union High School. Furnish & Install ONE (1) new RENEWAIRE Model # EV450IN ERU as specified in the Engineering spec document. • Furnish and install new ductwork to new ERU and existing AHU. • Connect power to new ERU Unit. • ATC controls will only get installed by Temperature Controls of VT. • Bidders shall not include ATC controls in their bid proposal, TCV is not part of MC/EC bid. • Start-up unit and complete start-up documentation. • TAB • Provide Commissioning support with Engineer verifying installation and operation to these contract documents. • Training & Documentation. Provide training on maintenance of new roof top unit. Provide O&M Manuals for roof top unit and controls. Documentation to include ASBUILT CONTROL Drawings and SEQUENCES OF OPERATION for all equipment installed. • Warrantee the installation for 1 year from dat |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |