Similar Projects
Refractory Replacement for a Bio-mass Chip Boiler
Bidding
Hyde Park, VT 05655

Boiler and Pump Replacement
Bidding
Belvidere, Belvidere Center, VT 05442

Renovations of HVAC in Dormitory Buildings
Post-Bid
$1,000,000 to $5,000,000 est. value
Vergennes, VT 05491

Mini-Split AC/Heat Pump, Ball Mountain Lake, Jamaica, VT and Townshend Lake, Townshend, VT
Post-Bid
$15,000 to $25,000 est. value
Jamaica, Townshend, VT 05353

Town Shed Chimney Replacement
Results
Barton, VT 05822

Unit Vent Replacement - Rutland Town School
Results
Rutland, VT 05701

North Troy Air Handling Unit
Bidding
$300,000 to $500,000 est. value
North Troy, VT

Heating Contractors - Weatherization Program Services
Term Contract
Post-Bid
Bennington, Rutland, VT

Wastewater Treatment Facility Digester Boiler Replacement
Results
Barre, VT 05641

Weatherization Program Services - Heating Contractors
Post-Bid
Addison, Chittenden, Franklin, Grand Isle, VT

Town Buildings HVAC
Term Contract
Results
Colchester, VT

Heating Contractors for Weatherization Assistance Program
Post-Bid

Police Department Ventilation System
Results
White River Junction, VT 05001

Wright Hall Chiller Replacement
Post-Bid
Burlington, VT 05401

Hinesburg Community School Kitchen Ventilation Upgrade
Results
Hinesburg, VT 05461

Reported 04/17/2021 12:00 AM
Project Title

Champlain Valley Union High School Administration ERU

Physical Address View project details and contacts
City, State (County) Hinesburg, VT 05461   (Chittenden County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Installing an Energy Recovery Unit at Champlain Valley Union High School. Furnish & Install ONE (1) new RENEWAIRE Model # EV450IN ERU as specified in the Engineering spec document. • Furnish and install new ductwork to new ERU and existing AHU. • Connect power to new ERU Unit. • ATC controls will only get installed by Temperature Controls of VT. • Bidders shall not include ATC controls in their bid proposal, TCV is not part of MC/EC bid. • Start-up unit and complete start-up documentation. • TAB • Provide Commissioning support with Engineer verifying installation and operation to these contract documents. • Training & Documentation. Provide training on maintenance of new roof top unit. Provide O&M Manuals for roof top unit and controls. Documentation to include ASBUILT CONTROL Drawings and SEQUENCES OF OPERATION for all equipment installed. • Warrantee the installation for 1 year from dat

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents